No.Condition Text
1.Condition 7 requires details for on-site parking for construction workers. The site has now been constructed and is occupied, and therefore these details are no longer required. For the purposes of this application, the condition can be considered discharged in FULL.
2.Condition 14 requires details of external lighting to be used during construction. Whilst it was confirmed that no external lighting would be proposed during construction, the site has now been constructed and is occupied, and therefore these details are no longer required. For the purposes of this application, the condition can be considered discharged in FULL.
3.Condition 18 requires details of the existing and proposed site levels. The documents submitted with this application are: - Site Sections C 18 MAR-PL10 Rev A (09.10.17) The submitted information is acceptable and is hereby approved and satisfies the submission element of condition 18. The agent has confirmed that the development has been built in accordance with these details. As the site has been constructed, this condition can be discharged.
4.Condition 19 requires details of finished floor levels. The documents submitted with this application include: - Engineering Layout 1 of 4 - IP16_042_02_001 Rev M - Engineering Layout 2 of 4 - IP16_042_02_002 Rev L - Engineering Layout 3 of 4 - IP16_042_02_003 Rev M - Engineering Layout 4 of 4 - IP16_042_02_004 Rev K The submitted information is acceptable and is hereby approved and satisfies the submission element of condition 19. The agent has confirmed that the development has been built in accordance with these plans. As the site has been constructed, this condition can be discharged.
5.Condition 21 requires details of boundary treatments. The documents submitted with this application include: - Landscape and External Works Masterplan MAR-LAND-SP Rev S (June 2016) - Landscape and External Works Sheet 1 of 3 MAR-LAND-01 Rev S (June 2016) - Landscape and External Works Sheet 2 of 3 MAR-LAND-02 Rev S (June 2016) - Landscape and External Works Sheet 3 of 3 MAR-LAND-03 Rev S (June 2016) The submitted information is acceptable and hereby approved and satisfies the submission element of condition 21. As the site has been constructed in accordance with the approved details, this condition can be discharged.
6.Condition 22 requires full details of the soft landscaping. The documents submitted with this application include: - Landscape and External Works Masterplan MAR-LAND-SP Rev S (June 2016) - Landscape and External Works Sheet 1 of 3 MAR-LAND-01 Rev S (June 2016) - Landscape and External Works Sheet 2 of 3 MAR-LAND-02 Rev S (June 2016) - Landscape and External Works Sheet 3 of 3 MAR-LAND-03 Rev S (June 2016) The submitted information is acceptable and hereby approved and satisfies the submission element of condition 22. As the site has been constructed in accordance with the approved details, this condition can be discharged.
7.Condition 24 requires details of the wheel washing facilities required during construction. The site has now been constructed and is occupied, and therefore these details are no longer required. For the purposes of this application, the condition can be considered discharged in FULL.
8.Condition 26 requires details of the proposed fire hydrants. The documents submitted with this application include: - Dwg. Number 104112956 Rev A (03.06.16) The submitted information is acceptable and hereby approved and satisfies the submission element of condition 26. As the site has been constructed in accordance with the approved details, this condition can be discharged.