| No. | Condition Text |
|---|
| 1. | The development must be begun not later than three years beginning with the date of this permission.
The reason for the condition is :-
The time limit condition is imposed in order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
| 2. | The development shall be carried out in accordance with the application form and approved plans (drawing reference: A02-06, A02-05 and A02-02A) received by the Local Planning Authority on 16 October 2017.
The reason for the condition is :-
For the avoidance of doubt. |
| 3. | Prior to the commencement of the development hereby approved full details of the surface water drainage strategy shall be submitted to and approved by the Local Planning Authority. The use of the development hereby approved shall not begin until the surface water strategy has been completed in accordance with the approved plans.
The reason for the condition is :-
In the interests of ensuring adequate disposal of surface water. |
| 4. | No part of the development hereby permitted shall be commenced until the existing vehicular access has been improved, laid out and completed in all respects in accordance with Suffolk County Council Standard Drawing Number DM04 'Industrial and Farm Access Layout'; and with an Entrance Width V=5.5m; Radius=15.0m and; Access Width=35.5m. Thereafter the access shall be retained in the specified form.
The reason for the condition is :-
In the interests of highway safety to ensure that the layout of the access is properly designed, constructed and provided before the development is commenced.
A copy of DM04 can be downloaded from https://www.suffolk.gov.uk/assets/Roads-and-transport/parking/DM04-B-SCC-SCD.pdf |
| 5. | No part of the development shall be commenced until details of the proposed access (including the position of any gates to be erected and visibility splays provided) have been submitted to and approved in writing by the Local Planning Authority. The approved access shall be laid out and constructed in its entirety prior to any other part of the development taking place.
Thereafter the access shall be retained in its approved form.
The reason for the condition is :-
To ensure that the access is designed and constructed to an appropriate specification and made available for use at an appropriate time in the interests of highway safety. |
| 6. | Before the development is commenced details shall be submitted to and approved in writing by the Local Planning Authority showing the means to prevent the discharge of surface water from the development onto the highway. The approved scheme shall be carried out in its entirety before the access is first used and shall be retained thereafter in its approved form.
The reason for the condition is :-
To prevent hazards caused by flowing water or ice on the highway. |
| 7. | Before the development is commenced details of the areas to be provided for the loading, unloading, manoeuvring and parking of vehicles including secure cycle storage shall be submitted to and approved in writing by the Local Planning Authority. The approved scheme shall be carried out in its entirety before the development is brought into use and shall be retained thereafter and used for no other purpose.
The reason for the condition is :-
To ensure the provision and long term maintenance of adequate on-site space for the parking and manoeuvring of vehicles, where on-street parking and manoeuvring would be detrimental to highway safety. |
| 8. | No development shall take place until an archaeological written scheme of investigation has been submitted to and approved by the local planning authority in writing. The scheme shall include an assessment of significance and research questions; and 1) The programme and methodology of site investigation and recording, 2) The programme for post investigation assessment, 3) Provision to be made for analysis of the site investigation and recording, 4) Provision to be made for publication and dissemination of the analysis and records of the site investigation, 5) Provision to be made for archive deposition of the analysis and records of the site investigation and 6) Nomination of a competent person or persons/organization to undertake the works set out within the written scheme of investigation.
The reason for the condition is :-
In the interests of preserving heritage assets in accordance with paragraph 141 of the National Planning Policy Framework. |
| 9. | No development shall take place other than in accordance with the written scheme of investigation approved under condition 8.
The reason for the condition is :-
In the interests of preserving heritage assets in accordance with paragraph 141 of the National Planning Policy Framework. |
| 10. | The development shall not be occupied until the site investigation and post investigation assessment has been completed in accordance with the programme set out in the archaeological written scheme of investigation approved under condition 8 and the provision to be made for analysis, publication and dissemination of results and archive deposition has been secured.
The reason for the condition is :-
In the interests of preserving heritage assets in accordance with paragraph 141 of the National Planning Policy Framework. |
| 11. | No development shall take place until there has been submitted to and approved by the Local Planning Authority a scheme of landscaping, which shall include indications of all existing trees and hedgerows on the land, and details of any to be retained, together with measures for their protection in the course of development.
The reason for the condition is:-
In the interests of the visual amenities of the locality. |
| 12. | All planting, seeding or turfing comprised in the approved details of landscaping shall be carried out in the first planting and seeding season following the occupation of the buildings or the completion of the development, whichever, is the sooner, and any trees or plants which within a period of 5 years from the completion of the development die, are removed or become seriously damaged or diseased shall be replaced in the next planting season with others of similar size and species, unless the Local Planning Authority gives written consent to any variation.
The reason for the condition is:-
In the interests of the visual amenities of the locality. |
| 13. | REASON FOR APPROVAL OF THE APPLICATION :-
The proposal meets the criteria outlined in policies CS2, CS6 and CS11 of the adopted Core Strategy. |
| 14. | STATEMENT OF POSITIVE ENGAGEMENT: In dealing with this application Great Yarmouth Borough Council has actively sought to work with the applicant in a positive and proactive manner, in accordance with paragraphs 186 and 187 of the NPPF. |
| 15. | NOTES - Please read the following notes carefully:-
It is an OFFENCE to carry out works within the public highway, which includes a Public Right of Way, without the permission of the Highway Authority.
Any conditions which involve work within the limits of the public highway do not give the applicant permission to carry them out. Unless otherwise agreed in writing all works within the public highway shall be carried out by the County Council or its agents at the applicant's expense.
The County Council's Operational Highways team 'Suffolk Highways' must be contacted on
Telephone: 0345 606 6067
Email: customer.service@suffolk.gov.uk.
Further information can be found at: https://www.suffolk.gov.uk/roads-and-transport/parking/apply-for-a-dropped-kerb/
A fee is payable to the Highway Authority for the assessment and inspection of both new vehicular crossing access works and improvements deemed necessary to existing vehicular crossings due to proposed development.
The works within the public highway will be required to be designed and constructed in accordance with the County Council's specification.
The applicant will also be required to enter into a legal agreement under the provisions of Section 278 of the Highways Act 1980 relating to the construction and subsequent adoption of the highway improvements. Amongst other things the Agreement will cover the specification of the highway works, safety audit procedures, construction and supervision and inspection of the works, bonding arrangements, indemnity of the County Council regarding noise insulation and land compensation claims, commuted sums, and changes to the existing street lighting and signing. |