Great Yarmouth Borough Council Portal
No.Condition Text
1.The development must be begun not later than three years beginning with the date of this permission. The reason for the condition is :- The time limit condition is imposed in order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.
2.The development shall be carried out in accordance with the plan received by the Local Planning Authority on the 11th October 2017. The reason for the condition is :- For the avoidance of doubt.
3.No development shall take place until the following information has been submitted to and approved in writing by the Local Planning Authority: (i) a full site survey showing: the datum used to calibrate the site levels levels along all site boundaries levels across the site at regular intervals floor levels of adjoining buildings (ii) full details of the proposed finished floor levels of all buildings and hard surfaces. The development shall be carried out only in accordance with the approved details. No development shall take place until full details of the finished levels, above ordnance datum, of the ground floor(s) of the proposed building(s), in relation to existing ground levels have been submitted to and approved by the Local Planning Authority. The development shall be carried out in strict accordance with the levels approved. The reason for the condtions is:- To ensure that the development takes place in the manner contemplated by the Local Planning Authority and to retain control over any significant changes in levels within the site.
4.The building hereby approved shall not, as annotated on the approved plan, have a ridge height that exceeds the ridge height at the lowest point of the converted and extended barn. The reason for the condition is :- For the avoidance of doubt.
5.The building hereby permitted shall not be altered in any way without the prior consent in writing of the Local Planning Authority. For the avoidance of doubt this includes the blocking up of windows or openings. The reason for the condition is :- In order to protect the character and appearance of the development.
6.The building hereby approved shall not be used for any purpose, including residential accommodation, other than domestic storage use in connection with the dwelling to which it relates, 5 Collis Lane. The reason for the condition is :- To ensure the car-ports ("cartsheds") are retained for the purpose intended and in the interests of the residential amenities of the occupiers of adjacent property.
7.All excavation works required to reduce the ground levels shall be carried prior to the commencement of the construction of the building hereby approved. The reason for the condition is :- For the avoidance of doubt.
8.STATEMENT OF POSITIVE ENGAGEMENT: In dealing with this application Great Yarmouth Borough Council has actively sought to work with the applicant in a positive and proactive manner, in accordance with paragraphs 186 and 187 of the NPPF.
9.REASON FOR APPROVAL OF THE APPLICATION :- The proposal meets the criteria set out in saved Policy HOU18 of the Great Yarmouth Borough-Wide Local Plan.