Great Yarmouth Borough Council Portal
No.Condition Text
1.Condition 6 states that: No works shall commence on the site until such time as detailed plans of the roads, footways, foul and surface water drainage have been submitted to and approved in writing by the Local Planning Authority in consultation with the Highway Authority. All construction works shall be carried out in accordance with the approved plans. The reason for the condition is:- To ensure satisfactory development of the site and a satisfactory standard of highway design and construction. The County Highway Authority confirmed by email dated 20th September 2017 that the submitted details were satisfactory and therefore the condition is discharged.
2.Condition 13 states that: Notwithstanding the details indicated on the submitted drawings, prior to the commencement of the development hereby permitted a detailed scheme for the off-site highway improvement works as shown indicatively on drawing numbered 695-03/001B and PE-PL01L shall be submitted to and approved in writing by the Local Planning Authority in consultation with the Highway Authority and the off-site highway improvement works shall be completed in accordance with the approved scheme to the written satisfaction of the Local Planning Authority in consultation with the Highway Authority prior to the first occupation of the development hereby approved. The reason for the condition is:- To ensure that the highway improvement works are designed to an appropriate standard in the interest of highway safety and to protect the environment of the highway corridor. The County Highway Authority by email dated 14th December 2018 confirmed the submitted details are satisfactory and therefore the condition is discharged.
3.Condition 22 states that: No infiltration of surface water drainage into the ground is permitted other than with the express written consent of the Local Planning Authority in consultation with the Environment Agency and the Lead Local Flood Authority. Permission for infiltration may be given for those parts of the site where it can be demonstrated that there is no resultant unacceptable risk to controlled waters. The development shall be carried out in accordance with the approved details only. The reason for the condition is:- To protect and prevent the pollution of controlled waters, particularly groundwater associated with the Secondary and Principal Aquifers underlying the site from potential pollutants associated with surface water drainage, in line with National Planning Policy Framework paragraphs 109 and 121, EU Water Directive Anglian River Basin Management Plan and Environment Agency Groundwater protection: Principles and practice (GP3) 2013 position statements. The Environment Agency responded on 23rd April 2020 and advised that the information provided in Harrison's Desk Study Report dated June 2014 was satisfactory. Accordingly, this condition is discharged.
4.Condition 31 states that: Prior to the commencement of the development hereby approved details of the positioning and type of no less than 4 fire hydrants shall be submitted to and approved by the Local Planning Authority in consultation with Norfolk County Council Fire Service. The fire hydrants shall all be placed prior to the occupation of the 160th dwelling hereby approved. The reason for the condition is:- To ensure that adequate hydrants are provided prior to the occupation of the dwellings. Norfolk Fire Service responded on 15th April 2020 and advised that the fire hydrants had been satisfactorily installed. Accordingly, this condition is discharged.