| No. | Condition Text |
|---|
| 1. | The development must be begun not later than three years beginning with the date of this permission.
The reason for the condition is :-
The time limit condition is imposed in order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
| 2. | The development shall be carried out in accordance with the application form and approved plan (drawing reference 17/112A 03 and 04) received by the Local Planning Authority on 1 June 2017.
The reason for the condition is :-
For the avoidance of doubt. |
| 3. | Prior to the commencement of the use hereby permitted the vehicular access shall be upgraded in accordance with the Norfolk County Council residential access construction specification for the first 5 metres as measured back from the near channel edge of the adjacent carriageway. Arrangement shall be made for surface water drainage from the site to be intercepted and disposed of separately so that it does not discharge into the highway carriageway.
The reason for the condition is :-
In the interest of highway safety and traffic movement. |
| 4. | Notwithstanding the submitted details unless otherwise agreed in writing by the Local Planning Authority the proposed private drive shall be maintained in perpetuity at a minimum width of 4.5 metres for its complete length of 10 metres as measured from the near edge of the highway carriageway and shall be constructed perpendicular to the highway carriageway for that said distance.
The reason for the condition is :-
In the interest of highway safety and traffic movement. |
| 5. | Prior to the first occupation of the development hereby permitted a visibility splay shall be provided in full accordance with the details indicated on the approved plan. The splay shall thereafter be maintained free from any obstruction exceeding 0.225 metres above the level of the adjacent highway carriageway.
The reason for the condition is :-
In the interests of highway safety. |
| 6. | Prior to the first occupation of the development hereby permitted the proposed access, on-site car and cycle parking and turning area shall be laid out, demarcated, levelled, surfaced and drained in accordance with the approved plan and retained thereafter available for that specific use.
The reason for the condition is :-
To ensure the permanent availability of the parking/manoeuvring area, in the interests of highway safety. |
| 7. | Construction work shall not take place outside the following hours:-
07:30 to 18:00 Monday to Friday
08:00 to 13:00 Saturday
and no work shall take place on Sundays or Bank Holidays.
(These hours shall only apply to work generating noise that is audible at the boundary of the nearest noise sensitive property)
The reason for the condition is :-
In the interests of the residential amenities of the occupiers of nearby dwellings. |
| 8. | Prior to the commencement of the development and to the satisfaction of the Environmental Services Group Manager, a Phase 1 contamination report shall be carried out to assess whether the land is likely to be contaminated. The report shall also include details of known previous uses and possible contamination arising from those uses. If contamination is suspected to exist, a Phase 2 site investigation is to be carried out to the satisfaction of the Environmental Services Group Manager. If the Phase 2 site investigation determines that the ground contains contaminants at unacceptable levels then the applicant is to submit a written strategy detailing how the site is to be remediated to a standard suitable for its proposed end-use to the Environmental Services Group Manager. No buildings hereby permitted shall be occupied until the remediation works agreed within the scheme have been carried out to the satisfaction of the Local Planning Authority.
The reason for the condition is :-
To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors. |
| 9. | In the event that contamination that was not previously identified is found at any time when carrying out the approved development, it must be reported in writing immediately to the Local Planning Authority. All development shall cease and shall not recommence until:
1) a report has been submitted and agreed in writing by the Local Planning Authority which includes results of an investigation and risk assessment together with proposed remediation scheme to deal with the risk identified and
2) the agreed remediation scheme has been carried out and a validation report demonstrating its effectiveness has been approved in writing by the Local Planning Authority.
The reason for the condition is :-
To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors. |
| 10. | No development shall take place until there has been submitted to and approved by the Local Planning Authority a scheme of landscaping, which shall include indications of all existing trees and hedgerows on the land, and details of any to be retained, together with measures for their protection in the course of development.
The reason for the condition is:-
In the interests of the visual amenities of the locality. |
| 11. | All planting, seeding or turfing comprised in the approved details of landscaping shall be carried out in the first planting and seeding season following the occupation of the buildings or the completion of the development, whichever, is the sooner, and any trees or plants which within a period of 5 years from the completion of the development die, are removed or become seriously damaged or diseased shall be replaced in the next planting season with others of similar size and species, unless the Local Planning Authority gives written consent to any variation.
The reason for the condition is:-
In the interests of the visual amenities of the locality. |
| 12. | Prior to the commencement of any works a Construction Traffic Management Plan and Access Route which shall incorporate adequate provision for addressing any abnormal wear and tear to the highway shall be submitted to and approved in writing with the Local Planning Authority in consultation with Norfolk County Council Highway Authority together with proposals to control and manage construction traffic using the 'Construction Traffic Access Route' and to ensure no other local roads are used by construction traffic.
The reason for the condition is :-
In the interests of maintaining highway efficiency and safety. |
| 13. | For the duration of the construction period all traffic associated with the construction of the development will comply with the Construction Traffic Management Plan and use only the Construction Traffic Access Route and no other local roads unless approved in writing with the Local Planning Authority in consultation with the Highway Authority
The reason for the condition is :-
In the interests of maintaining highway efficiency and safety. |
| 14. | The two agricultural units shown to be removed on the approved plan must be fully demolished and removed from site prior to the commencement of the construction of the residential dwellings hereby approved.
The reason for the condition is :-
To ensure a suitable development in accordance of the approved plans. |
| 15. | STATEMENT OF POSITIVE ENGAGEMENT: In dealing with this application Great Yarmouth Borough Council has actively sought to work with the applicant in a positive and proactive manner, in accordance with paragraphs 186 and 187 of the NPPF. |
| 16. | REASON FOR APPROVAL OF THE APPLICATION :-
The proposal is considered to comply with polices CS1 and CS9 of the adopted Core Strategy. |
| 17. | NOTES - Please read the following notes carefully:-
Please read Environmnetal Health's comments regarding Local Air Quality and ensure the development meets all requirements. |
| 18. | This development involves works within the public highway that can only be carried out by Norfolk County Council as Highway Authority unless otherwise agreed in writing.
It is an OFFENCE to carry out any works within the Public Highway, which includes a Public Right of Way, without the permission of the Highway Authority. Please note that it is the applicant's responsibility to ensure that, in addition to planning permission, any necessary consents or approvals under the Highways Act 1980 and the New Roads and Street Works Act 1991 are also obtained from the County Council. Advice on this matter can be obtained from the County Council's Highway Development Management and Operations team on 0344 800 8020.
If required, street furniture will need to be repositioned at the applicant's expense.
Public Utility apparatus may be affected by this proposal. Contact the appropriate utility service to reach agreement on any necessary alterations, which have to be carried out at the expense of the developer. |