Great Yarmouth Borough Council Portal
No.Condition Text
1.The development must be begun not later than three years beginning with the date of this permission. The reason for the condition is :- Required to be imposed pursuant to Section 51 of the Planning and Compulsory Purchase Act 2004.
2.The development shall be carried out in accordance with the amended plans Drawing nos.1196.SR/HWY/001.001 Rev E, 1196.SR/HWY/002 Rev E and 1196.SR/HWY/001.003 Rev A. The reason for the condition is :- For the avoidance of doubt and in accordance with the submitted drawings.
3.No works shall commence on the site until such time as detailed plans of the roads, footways, cycleways, foul and surface water drainage have been submitted to and approved in writing by the Local Planning Authority in consultation with the Highway Authority. All construction works shall be carried out in accordance with the approved plans The reason for the condition is :- To ensure satisfactory development of the site and to ensure estate roads are constructed to a standard suitable for adoption as public highway.
4.No works shall be carried out on roads, footways, cycleways, foul and surface water sewers otherwise than in accordance with the specifications of the Local Planning Authority in consultation with the Highway Authority. The reason for the condition is :-To ensure satisfactory development of the site and to ensure estate roads are constructed to a standard suitable for adoption as public highway.
5.Notwithstanding the submitted plans the pumping station shall be located a minimum of 15m away from any residential property and its curtilage. The reason for the condition is :-In the interest of the residential amenity of the occupiers of residential properties in the locality of the pumping station.
6.REASON FOR APPROVAL OF THE APPLICATION :- Subject to the above conditions the the proposal is considered by the Local Planning Authority to comply with Policy
7.STATEMENT OF POSITIVE ENGAGEMENT: In dealing with this application Great Yarmouth Borough Council has actively sought to work with the applicant in a positive and proactive manner, in accordance with paragraphs 186 and 187 of the NPPF