No.Condition Text
1.The development must be begun not later than three years beginning with the date of this permission. The reason for the condition is:- Required to be imposed pursuant to Section 18 of the Planning (Listed Building and Conservation Areas) Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.
2.The development shall be carried out in accordance with the revised plan received by the Local Planning Authority on the 3rd January 2018, drawing number 10220-12, revised plans received on the 26th February 2018 reference 10220- 06G and 1220 - 05G, revised plans received on the 7th March 2017 reference 10220 - 11A, 10220-10-02 and 10220-10-07, details received on the 6th February 2018 reference project ref 208432 sheet no. P4, P5, P6 and P7 and the bat method statement received on the 1st March 2018. The plans illustrate the development approved, the structure is to remain intact in accordance with the Historic Building Survey and Report received on the 22nd September 2016. The reason for the condition is :- For the avoidance of doubt.
3.Prior to the first occupation of the development hereby approved details of location and type of 2no. bat boxes shall be submitted to and approved by the Local Planning Authority. The bat boxes shall be erected prior to the first occupation of the development and shall be retained in perpetuity. The reason for the condition is:- To ensure that adequate provision for bats is provided as a betterment to encourage additional roosting.
4.Prior to the commencement of the use hereby permitted the vehicular access shall be upgraded in accordance with the Norfolk County Council residential / industrial access construction specification for the first 5 metres as measured back from the near channel edge of the adjacent carriageway. Arrangement shall be made for surface water drainage from the site to be intercepted and disposed of separately so that it does not discharge into the highway carriageway. The reason for the condition is :- In the interest of highway safety and traffic movement.
5.Notwithstanding the provisions of Class A of Schedule 2, Part 2 of the Town and Country Planning (General Permitted Development) (England) Order 2015, (or any Order revoking, amending or re-enacting that Order) no gates, bollard, chain or other means of obstruction shall be erected across the approved access unless details have first been submitted to and approved by the Local Planning Authority. The reason for the condition is :- In the interests of highway safety.
6.Prior to the first occupation of the development hereby permitted a visibility splay measuring 2.4m x road side extremities (east side) shall be provided to each side of the access where it meets the highway and such splays shall thereafter be maintained free from any obstruction exceeding 0.6 metres above the level of the adjacent highway carriageway. The reason for the condition is :- In the interests of highway safety.
7.Prior to the first occupation of the development hereby permitted sufficient space shall be provided within the site to enable three standard size family cars to turn and re-enter the highway in a forward gear. This area shall be levelled, surfaced and drained in accordance with a detailed scheme submitted to and approved in writing by the Local Planning Authority, in consultation with the Highway Authority, and thereafter available for that specific use. The reason for the condition is :- In the interests of satisfactory development and highway safety.
8.Construction work shall not take place outside the following hours:- 07:30 to 18:00 Monday to Friday 08:00 to 13:00 Saturday and no work shall take place on Sundays or Bank Holidays. (These hours shall only apply to work generating noise that is audible at the boundary of the nearest noise sensitive property) The reason for the condition is :- In the interests of the residential amenities of the occupiers of nearby dwellings.
9.Prior to the occupation of the development hereby permitted a Phase 2 site investigation is to be carried out and details submitted to and approved by the Local Planning Authority in consultation with Environmental Services. If the Phase 2 site investigation determines that the ground contains contaminants at unacceptable levels a written strategy detailing how the site is to be remediated to a standard suitable for its proposed end-use is to be submitted to and approved by the Local Planning Authority in consultation with Environmental Services. No dwellings/buildings hereby permitted shall be occupied until the remediation works agreed within the scheme have been carried out to the satisfaction of the Local Planning Authority. Reason for the condition:- To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors.
10.In the event that contamination that was not previously identified is found at any time when carrying out the approved development, it must be reported in writing immediately to the Local Planning Authority. All development shall cease and shall not recommence until: 1) a report has been submitted and agreed in writing by the Local Planning Authority which includes results of an investigation and risk assessment together with proposed remediation scheme to deal with the risk identified and 2) the agreed remediation scheme has been carried out and a validation report demonstrating its effectiveness has been approved in writing by the Local Planning Authority. The reason for the condition is :- To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors.
11.STATEMENT OF POSITIVE ENGAGEMENT: In dealing with this application Great Yarmouth Borough Council has actively sought to work with the applicant in a positive and proactive manner, in accordance with paragraphs 186 and 187 of the NPPF.
12.REASON FOR APPROVAL OF THE APPLICATION :- The proposal meets the criteria set out in saved Policy CS2 and CS10 of the Great Yarmouth Core Strategy and saved policies BNV21 and HOU11 of the Borough Wide Local Plan.
13.This development involves works within the public highway that can only be carried out by Norfolk County Council as Highway Authority unless otherwise agreed in writing. It is an OFFENCE to carry out any works within the Public Highway, which includes a Public Right of Way, without the permission of the Highway Authority. Please note that it is the applicant's responsibility to ensure that, in addition to planning permission, any necessary consents or approvals under the Highways Act 1980 and the New Roads and Street Works Act 1991 are also obtained from the County Council. Advice on this matter can be obtained from the County Council's Highway Development Management and Operations team on 0344 800 8020. If required, street furniture will need to be repositioned at the applicant's expense. Public Utility apparatus may be affected by this proposal. Contact the appropriate utility service to reach agreement on any necessary alterations, which have to be carried out at the expense of the developer.