No.Condition Text
1.The development must be begun not later than three years beginning with the date of this permission. The reason for the condition is :- The time limit condition is imposed in order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.
2.The development shall be carried out in accordance with the application form received by the Local Planning Authority on 6 May 2016 and the revised plan received by the Local Planning Authority on the 8 August 2016. The reason for the condition is :- For the avoidance of doubt.
3.Prior to the first occupation of the development hereby permitted the vehicular access shall be provided and thereafter retained in the position shown on the approved plan (drawing number 1098/1 Rev A) in accordance with highway specification (dwg.No. TRAD 5) attached. Arrangement shall be made for surface water drainage to be intercepted and disposed of separately so that it does not discharge from or onto the highway carriageway. The reason for the condition is :- To ensure satisfactory access into the site and avoid carriage of extraneous material or surface water from or onto the highway.
4.Notwithstanding the provisions of Class A of Schedule 2, Part 2 of the Town and Country Planning (General Permitted Development) (England) Order 2015, (or any Order revoking, amending or re-enacting that Order) no gates, bollard, chain or other means of obstruction shall be erected across the approved access unless details have first been submitted to and approved by the Local Planning Authority. The reason for the condition is :- In the interests of highway safety.
5.Prior to the first occupation of the development hereby permitted a 2.4 metre wide parallel visibility splay (as measured back from the near edge of the adjacent highway carriageway) shall be provided across the whole of the site's roadside frontage (Mill Road). The parallel visibility splay shall thereafter be maintained free at all times from any obstruction exceeding 1.05 metres above the level of the adjacent highway carriageway. The reason for the condition is :- In the interests of highway safety.
6.Prior to the first occupation of the development hereby permitted the proposed access, on-site car parking area shall be laid out, demarcated, levelled, surfaced and drained in accordance with the approved plan and retained thereafter available for that specific use. The reason for the condition is :- To ensure the permanent availability of the parking/manoeuvring area, in the interests of highway safety.
7.No development shall take place and, notwithstanding the approved plans, no trees shall be removed until there has been submitted to and approved by the Local Planning Authority a scheme of landscaping, which shall include indications of all existing trees and hedgerows on the land and details of any to be retained, together with an Arboricultural Method Statement detailing full details of protection methods for all trees affected by the development. The development shall be carried out in accordance with the approved details. The reason for the condition is :- To protect trees which are of important landscape value.
8.Construction work shall not take place outside the following hours:- 08:00 to 18:00 Monday to Friday 08:30 to 13:30 Saturday and no work shall take place on Sundays or Bank Holidays. (These hours shall only apply to work generating noise that is audible at the boundary of the nearest noise sensitive property) The reason for the condition is :- In the interests of the residential amenities of the occupiers of nearby dwellings.
9.No works shall commence on site until such time as details of the slab levels of the dwelling(s) in relation to existing ground levels have been submitted to and approved by the Local Planning Authority. The dwelling(s) shall be constructed in accordance with the agreed levels. The reason for the condtions is:- To ensure that the development takes place in the manner contemplated by the Local Planning Authority and to retain control over any significant changes in levels within the site.
10.REASON FOR APPROVAL OF THE APPLICATION :- The proposal meets the criteria outlined in saved policies HOU07 and HOU17 of the Borough Wide Local Plan and policies CS2 and CS3 of the adopted Core Strategy.
11.STATEMENT OF POSITIVE ENGAGEMENT: In dealing with this application Great Yarmouth Borough Council has actively sought to work with the applicant in a positive and proactive manner, in accordance with paragraphs 186 and 187 of the NPPF.
12.It is an OFFENCE to carry out any works within the Public Highway, which includes a Public Right of Way, without the permission of the Highway Authority. This development involves work to the public highway that can only be undertaken within the scope of a Legal Agreement between the applicant and the County Council. Please note that it is the applicant's responsibility to ensure that, in addition to planning permission, any necessary Agreements under the Highways Act 1980 are also obtained. Advice on this matter can be obtained from the County Council's Highways Development Management Group based at County Hall in Norwich. Please contact Developer Services on 0344 800 8020. Public Utility apparatus may be affected by this proposal. Contact the appropriate utility service to reach agreement on any necessary alterations, which have to be carried out at the expense of the developer. If required, street furniture will need to be repositioned at the applicant's expense.