Great Yarmouth Borough Council Portal
No.Condition Text
1.The development must be begun not later than three years beginning with the date of this permission. The reason for the condition is :- The time limit condition is imposed in order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.
2.The development shall be carried out in accordance with the application form received by the Local Planning Authority on the 9th May 2016 and the revised plan recieved by the Local Planning Authority on the 22nd July 2015. The reason for the condition is :- For the avoidance of doubt.
3.Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015 (or any order revoking and re-enacting the order) no extensions shall be built, no windows inserted into the walls or roof of the building other than those shown on the approved drawings and no outbuildings erected without the prior written approval of the Local Planning Authority. The reason for the condition is:- In the interests of the residential amenities of the occupiers of the adjacent property.
4.The windows as shown on the first floor of the rear and side elevations of the dwelling house shall be obscure glazed and non-opening unless the parts of the window which can be opened are more than 1.7 metres above the floor of the room in which the window is installed. The windows shall remain in this condition, obscure glaze and non-opening, in perpetuity. The reason for the condition is:- In the interests of the residential amenities of the occupiers of the adjacent property.
5.Prior to the first occupation of the development hereby permitted the vehicular access shall be provided and thereafter retained at the position shown on the approved plan (drawing number 1411:59:02) in accordance with highway specification (Dwg. No. TRAD 1) attached. Arrangement shall be made for surface water drainage to be intercepted and disposed of separately so that it does not discharge from or onto the highway carriageway. The reason for the condition is :- To ensure satisfactory access into the site and avoid carriage of extraneous material or surface water from or onto the highway.
6.Notwithstanding the provisions of Class A of Schedule 2, Part 2 of the Town and Country Planning (General Permitted Development) (England) Order 2015, (or any Order revoking, amending or re-enacting that Order) no gates, bollard, chain or other means of obstruction shall be erected across the approved access unless details have first been submitted to and approved by the Local Planning Authority. The reason for the condition is :- In the interests of highway safety.
7.Prior to the first occupation of the development hereby permitted a visibility splay shall be provided in full accordance with the details indicated on the approved plan. The splay shall thereafter be maintained free from any obstruction exceeding 0.225 metres above the level of the adjacent highway carriageway. The reason for the condition is :- In the interests of highway safety.
8.Prior to the first occupation of the development hereby permitted the proposed access, on-site car parking, service and turntable (the details of which are to be agreed with the Local Planning Authority in consultation with the Highway Authority) shall be laid out, demarcated, levelled, surfaced and drained in accordance with the approved plan and retained thereafter available for that specific use. The reason for the condition is :- To ensure the permanent availability of the parking/manoeuvring area, in the interests of highway safety.
9.No works shall commence on site until such time as details of the slab levels of the dwelling in relation to existing ground levels have been submitted to and approved by the Local Planning Authority. The reason for the condtions is:- To ensure that the development takes place in the manner contemplated by the Local Planning Authority and to retain control over any significant changes in levels within the site.
10.STATEMENT OF POSITIVE ENGAGEMENT: In dealing with this application Great Yarmouth Borough Council has actively sought to work with the applicant in a positive and proactive manner, in accordance with paragraphs 186 and 187 of the NPPF.
11.REASON FOR APPROVAL OF THE APPLICATION :- The proposal meets the criteria set out in Policy HOU7 of the adopted Great Yarmouth Borough-wide Local Plan.