| No. | Condition Text |
|---|
| 1. | The development must be begun not later than three years beginning with the date of this permission.
The reason for the condition is :-
The time limit condition is imposed in order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
| 2. | The development shall be carried out in accordance with the details contained in the planning application forms and drawing no's 2430.01, 2430.02 and 2430.03 received by the Local Planning Authority on 24th March 2016.
The reason for the condition is :-
For the avoidance of doubt. |
| 3. | The dwelling hereby permitted shall be of single storey construction and notwithstanding the provisions of the Town and Country Planning, (General Permitted Development) (England) Order 2015 (or any order revoking and re-enacting that Order with or without modification), no dormer windows or other openings to the roofspace shall be provided without the prior consent of the Local Planning Authority.
The reason for the condition is:-
In the interests of the residential amenities of the occupiers of adjacent residential properties. |
| 4. | Prior to the commencment of the use hereby permitted, the new vehicular access shall be provided and thereafter retained in the position shown on the approved plan (drawing no. 2430.03) in accordance with the attached highway specification (Dwg. No. TRAD 2). Arrangement shall be made for surface water drainage to be intercepted and disposed of separately so that it does not discharge from or onto the highway carriageway.
The reason for the condition is :-
To ensure satisfactory access into the site and avoid carriage of extraneous material or surface water from or onto the highway. |
| 5. | Prior to the commencement of the use hereby permitted, a visibility splay measuring 2.4 metres x 43 metres shall be provided to each side of the access where it meets the highway and such splays shall thereafter be maintained at all times free from any obstruction exceeding 1.05 metres above the level of the adjacent highway carriageway.
The reason for the condition is :-
In the interests of highway safety. |
| 6. | Prior to the first occupation of the dwelling hereby permitted, any access gate(s), bollard, chain or other means of obstruction shall be hung to open inwards and set back and thereafter maintained a minimum distance of 5 metres from the near channel edge of the adjacent carriageway. Any sidewalls, fences or hedges adjacent to the access shall be splayed at an angle of 45 degrees from each of the (outside) gateposts to the front boundary of the site.
The reason for the condition is :-
To enable vehicles to safely draw off the highway before the gate(s) or obstruction is opened. |
| 7. | Prior to the first use of the dwelling hereby permitted, the proposed access, on-site car parking and turning area shall be laid out in accordance with the approved plan and retained thereafter available for that specific use.
The reason for the condition is :-
To ensure the permanent availability of the parking/manoeuvring area, in the interests of highway safety. |
| 8. | REASON FOR APPROVAL OF THE APPLICATION :-
The proposals meet the criteria for new housing development set out in saved Policies HOU7 and HOU17 of the Great Yarmouth Borough-wide Local Plan. |
| 9. | STATEMENT OF POSITIVE ENGAGEMENT: In dealing with this application Great Yarmouth Borough Council has actively sought to work with the applicant in a positive and proactive manner, in accordance with paragraphs 186 and 187 of the NPPF. |
| 10. | NOTES - Please read the following notes carefully:-
This development involves works within the public highway that can only be carried out by Norfolk County Council as Highway Authority unless otherwise agreed in writing.
It is an OFFENCE to carry out any works within the Public Highway, which includes a Public Right of Way, without the permission of the Highway Authority. Please note that it is the applicant's responsibility to ensure that, in addition to planning permission, any necessary consents or approvals under the Highways Act 1980 and the New Roads and Street Works Act 1991 are also obtained from the County Council. Advice on this matter can be obtained from the County Council's Highway Development Management Group. Please contact developer services on 0344 800 8020.
If required, street furniture will need to be repositioned at the applicant's expense.
Public Utility apparatus may be affected by this proposal. Contact the appropriate utility service to reach agreement on any necessary alterations, which have to be carried out at the expense of the developer. |