No.Condition Text
1.The development must be begun not later than three years beginning with the date of this permission. The reason for the condition is :- The time limit condition is imposed in order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.
2.The development shall be carried out in accordance with the application form, design and access statement and approved plans received by the Local Planning Authority on 7 December 2015 and the Flood Risk Assessment received on 5 January 2016. The reason for the condition is :- For the avoidance of doubt.
3.The car park hereby approved shall not be brought into use until a revised flood response plan has been submitted to and approved by the Local Planning Authority. The reason for the condition is :- In the interests of safety within a flood zone.
4.No external lighting shall be installed other than in accordance with the lighting plan as illustrated on the submitted plans and shall be retained such that it will not cause glare beyond the site boundaries. The reason for the condition is :- In the interests of highway safety.
5.The external lighting should be installed and directed in such a manner as to cause no inconvenience or hazard to the users of the adjacent highway. The County Council reserves the right to inspect the installation to confirm that this condition is met and to request the fitting of louvers or baffles if required. The reason for the condition is:- In the interests of highway safety.
6.REASON FOR APPROVAL OF THE APPLICATION :- The proposal meets the criteria outlined in policy REC11 and TR21 of the Borough Wide Local Plan and policy CS8, CS9 and CS15 of the Core Strategy.
7.STATEMENT OF POSITIVE ENGAGEMENT: In dealing with this application Great Yarmouth Borough Council has actively sought to work with the applicant in a positive and proactive manner, in accordance with paragraphs 186 and 187 of the NPPF.
8.NOTES - Please read the following notes carefully which were made by the BPA in relation to this proposal:- 1) These are Major Hazard Pipelines 2) Any construction must be kept to a minimum of 6m from the pipeline 3) All excavations (including hand trail holes) within 6m of the pipeline must be approved and supervised by BPA. 4) The exact location of the pipeline to be marked by BPA in consultation with the developer prior to detailed design. 5) Nominal cover is only 0.9m (3'). 6) Normal vertical clearance for new services is 600mm. 7) These Pipelines are protected by cathodic protection and you should consult the BPA if you are laying HV cables or ferrous services (with or without cathodic protection). 8) Heavy vehicular crossing points to be approved before use across the easement. 9) Tree planting is prohibited within the 6m easement. 10) No lowering or significantly raising of ground level throughout the easement. 11) Roadways should, where possible, cross the pipelines using the appropriate protection detailed in Appendix 1 of the enclosed booklet and not run along the pipeline route. 12) A Continuous site presence will be required whilst the pipeline/s are exposed.