| No. | Condition Text |
|---|
| 1. | Application for approval of reserved matters must be made not later than the expiration of two years beginning with the date of this permission and the development must be begun not later than the expiration of two year(s) from the final approval of the reserved matters or, in the case of approval on different dates, the final approval of the last such matter to be approved.
The reason for this condition is:-
Required to be imposed pursuant to Section 51 of the Planning and Compulsory Purchase Act 2004. |
| 2. | No development whatsoever shall take place until full details of the siting, design, external appearance and landscaping of the development (herein after referred to as the reserved matters) have been submitted to and approved by the Local Planning Authority and the development shall be carried out strictly in accordance with such approved details.
The reason for the condition is:-
Such details have not been submitted as part of this application. |
| 3. | The residential development hereby granted planning permission shall be located wholly within and limited to the land shown in red, totalling 2.36 ha, in accordance with the site plan received by the Local Authority on the 16th November 2015 Drawing Ref No. 58393-100 site location plan and for a maximum of 55 dwellings.
The reason for the condition is:-
For the avoidance of doubt and in accordance with the application.
|
| 4. | No works shall commence on the site until such time as detailed plans of the roads, footways, foul and surface water drainage have been submitted to and approved in writing by the Local Planning Authority in consultation with the Highway Authority. Any such scheme for road construction shall include the provision of fire hydrants to serve the site in accordance with a scheme to be agreed with the Local Planning Authority. All works for the construction of the fire hydrant system shall be carried out concurrently with the construction of the road network and shall be to an adoptable standard.
The reason for condition is:-
To ensure the construction of estate roads are of a standard suitable for adoption as County roads and to provide necessary facilities for the satisfactory development of the site. |
| 5. | No works shall be carried out on roads, footways, foul and surface water sewers otherwise than in accordance with the specifications of the Local Planning Authority in consultation with the Highway Authority.
The reason for the condition is :-
To provide highways details that were not included within the application and to ensure acceptable access is provided. |
| 6. | Before any dwelling is first occupied the road(s) and footway(s) shall be constructed to binder course surfacing level from the dwelling to the adjoining County road in accordance with the details to be approved in writing by the Local Planning Authority in consultation with the Highway Authority.
The reason for the condition is :-
To ensure the construction of estate roads are of a standard suitable for adoption as County roads. |
| 7. | Development shall not commence until a scheme detailing provision for on-site parking for construction workers for the duration of the construction period has been submitted to and approved in writing by the Local Planning Authority. The scheme shall be implemented throughout the construction period.
The reason for the condition is :-
In the interest of highway safety. |
| 8. | Prior to the commencement of any works a Construction Traffic Management Plan and Access Route which shall incorporate adequate provision for addressing any abnormal wear and tear to the highway shall be submitted to and approved in writing with the Local Planning Authority in consultation with Norfolk County Council Highway Authority together with proposals to control and manage construction traffic using the 'Construction Traffic Access Route' and to ensure no other local roads are used by construction traffic.
The reason for the condition is :-
In the interests of maintaining highway efficiency and safety.
|
| 9. | For the duration of the construction period all traffic associated with the construction of the development will comply with the Construction Traffic Management Plan and use only the 'Construction Traffic Access Route' and no other local roads unless approved in writing with the Local Planning Authority in consultation with the Highway Authority.
The reason for the condition is :-
In the interests of maintaining highway efficiency and safety. |
| 10. | No works shall commence on site unless otherwise agreed in writing until a detailed scheme for a village gateway treatment on Rollesby Road to enhance compliance with the 30mph speed limit have been submitted to and approved in writing by the Local Planning Authority in consultation with the Highway Authority.
The reason for the condition is :-
In the interests of maintaining highway efficiency and safety. |
| 11. | No works shall commence on site unless otherwise agreed in writing until a detailed scheme for a 20mph zone on Rowan Road, Willow Way & Acacia Avenue has been approved and the Traffic Regulation Order has been promoted by the Highway Authority.
The reason for the condition is :-
In the interests of maintaining highway efficiency and safety. |
| 12. | Prior to the first occupation of the development hereby permitted the off-site highway improvement works referred to in Conditions 10 and 11 shall be completed to the written satisfaction of the Local Planning Authority in consultation with the Highway Authority.
The reason for the condition is :-
In the interests of maintaining highway efficiency and safety. |
| 13. | The plots adjacent to Acacia Avenue as shown on the indicative plan shall be single storey only.
The reason for the condition is :-
In the interest of neigbour amenity and impact upon the street scene. |
| 14. | No drainage works shall commence until a surface water management strategy has been submitted to and approved in writing by the local planning authority. No hard-standing areas to be constructed until the works have been carried out in accordance with the surface water strategy so approved unless otherwise agreed in writing by the local planning authority.
The reason for the condition is :-
To prevent environmental and amenity problems arising from flooding. |
| 15. | No development approved by this planning permission (or such other date or stage in development as may be agreed in writing with the Local Planning Authority), shall take place until a scheme that includes the following components to deal with the risks associated with contamination of the site shall each be submitted to and approved, in writing, by the local planning authority:
1) A preliminary risk assessment which has identified: all previous uses potential contaminants associated with those uses a conceptual model of the site indicating sources, pathways and receptors potentially unacceptable risks arising from contamination at the site.
2) A site investigation scheme, based on (1) to provide information for a detailed assessment of the risk to all receptors that may be affected, including those off site.
3) The results of the site investigation and detailed risk assessment referred to in (2) and, based on these, an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken.
4) A verification plan providing details of the data that will be collected in order to demonstrate that the works set out in the remediation strategy in (3) are complete and identifying any requirements for longer- term monitoring of pollutant linkages , maintenance and arrangements for contingency action.
Any changes to these components require the express written consent of the local planning authority. The scheme shall be implemented as approved.
The reason for the condition is :-
To protect and prevent the pollution of the water environment (particularly groundwater associated with the underlying Secondary and Principal Aquifers, from potential pollutants associated with current and previous land uses) in line with National Planning Policy Framework (NPPF; paragraphs 109 and 121), EU Water Framework Directive, Anglian River Basin Management Plan and Environment Agency Groundwater protection: Principles and practice (GP3:2013) position statements. |
| 16. | No occupation of any part of the permitted development shall take place until a verification report demonstrating completion of works set out in the approved remediation strategy and the effectiveness of the remediation shall be submitted to and approved, in writing, by the local planning authority. The report shall include results of sampling and monitoring carried out in accordance with the approved verification plan to demonstrate that the site remediation criteria have been met. It shall also include any plan (a "long-term monitoring and maintenance plan") for longer-term monitoring of pollutant linkages, maintenance and arrangements for contingency action, as identified in the verification plan. The long-term monitoring and maintenance plan shall be implemented as approved.
The reason for the condition is :-
To protect and prevent the pollution of the water environment (particularly groundwater associated with the underlying Secondary and Principal Aquifers, from potential pollutants associated with current and previous land uses) in line with National Planning Policy Framework (NPPF; paragraphs 109 and 121), EU Water Framework Directive, Anglian River Basin Management Plan and Environment Agency Groundwater protection: Principles and practice (GP3:2013) position statements. |
| 17. | No development should take place until a long-term monitoring and maintenance plan in respect of contamination including a timetable of monitoring and submission of reports to the Local Planning Authority, shall be submitted to and approved in writing by the Local Planning Authority. Reports as specified in the approved plan, including details of any necessary contingency action arising from the monitoring, shall be submitted to and approved in writing by the Local Planning Authority. Any necessary contingency measures shall be carried out in accordance with the details in the approved reports. On completion of the monitoring specified in the plan a final report demonstrating that all long-term remediation works have been carried out and confirming that remedial targets have been achieved shall be submitted to and approved in writing by the Local Planning Authority.
The reason for the condition is :-
To protect and prevent the pollution of the water environment (particularly groundwater associated with the underlying Secondary and Principal Aquifers, from potential pollutants associated with current and previous land uses) in line with National Planning Policy Framework (NPPF; paragraphs 109 and 121), EU Water Framework Directive, Anglian River Basin Management Plan and Environment Agency Groundwater protection: Principles and practice (GP3:2013) position statements. |
| 18. | If, during development, contamination not previously identified if found to be present at the site then no further development (unless otherwise agreed in writing with the local planning authority) shall be carried out until the developer has submitted a remediation strategy to the local planning authority detailing how this unsuspected contamination shall be dealt with and obtained written approval from the local planning authority. The remediation strategy shall be implemented as approved.
The reason for the condition is:-
To protect and prevent the pollution of the water environment (particularly groundwater associated with the underlying Secondary and Principal Aquifers, from potential pollutants associated with current and previous land uses) in line with National Planning Policy Framework (NPPF; paragraphs 109 and 121), EU Water Framework Directive, Anglian River Basin Management Plan and Environment Agency Groundwater protection: Principles and practice (GP3:2013) position statements. |
| 19. | No works shall commence on the construction of the dwellings until such time as details of the slab levels of the dwellings in relation to existing ground levels have been submitted to and approved in writing by the Local Planning Authority.
The reason for the condition is:-
In order to retain control over any significant changes in levels within the site and in the interests of the residential amenities of the occupiers of adjacent property. |
| 20. | No development shall occur outside of the following hours:
07:30 - 18:00 Monday to Friday
08:30 - 13:30 Saturdays
No work on Sundays or Bank Holidays
The reason for the condition is:-
To protect the amenities of nearby residential dwellings
|
| 21. | No work above ground level shall commence until the exact type and colour of the materials to be used in the construction of the external surfaces of the dwellings and hard landscaping including private driveways and surfaces have been submitted to and approved by the Local Planning Authority and all works shall be carried out in accordance with such details as may be agreed.
The reason for the condition is:-
In the interests of the visual amenities of the area as precise details of the materials have not been submitted. |
| 22. | No development shall take place until there has been submitted to and approved by the Local Planning Authority a scheme of landscaping, which shall include indications of all existing trees and hedgerows on the land, and details of any to be retained, together with measures for their protection in the course of development.
The reason for the condition is:-
In the interests of the visual amenities of the locality. |
| 23. | All planting, seeding or turfing comprised in the approved details of landscaping shall be carried out within 9 months of the occupation of the dwelling on any plot to which the planting seeding or turfing relates, and any trees or plants which within a period of 5 years from the completion of the development die, are removed or become seriously damaged or diseased shall be replaced in the next planting season with others of similar size and species, unless the Local Planning Authority gives written consent to any variation.
The reason for the condition is:-
In the interests of the visual amenities of the locality. |
| 24. | Before any of the dwellings are constructed, full details of the height and materials of any means of enclosure between the dwellings and the highway/driveway onto which they front shall be submitted for the approval, in writing, of the Local Planning Authority and no dwelling shall be first occupied until that means of enclosure has been provided in accordance with the approved details.
The reason for the condition is:-
In the interests of the visual amenities of the area.
|
| 25. | No works shall commence on site until the details of wheel cleaning facilities for construction vehicles have been submitted to and approved in writing by the Local Planning Authority in consultation with the Highway Authority and for the duration of the construction period all traffic associated with the construction of the development permitted will use the approved wheel cleaning facilities.
The reason for the condition is:-
To prevent extraneous material being deposited on the highway. |
| 26. | STATEMENT OF POSITIVE ENGAGEMENT: In dealing with this application Great Yarmouth Borough Council has actively sought to work with the applicant in a positive and proactive manner, in accordance with paragraphs 186 and 187 of the NPPF. |
| 27. | NOTES - Please read the following notes carefully:-
The Highway Authority make the following comments with regard to the proposals and the applicant's attention is drawn to the need to fully comply with them It is an OFFENCE to carry out any works within the Public Highway, which includes a Public Right of Way, without the permission of the Highway Authority. This development involves work to the public highway that can only be undertaken within the scope of a Legal Agreement between the Applicant and the County Council. Please note that it is the Applicant's responsibility to ensure that, in addition to planning permission, any necessary agreements under the Highways Act 1980 are also obtained. Public Utility apparatus may be affected by this proposal. Contact the appropriate utility service to reach agreement on any necessary alterations, which have to be carried out at the expense of the developer. If required, street furniture will need to be repositioned at the Applicants own expense. This development involves works within the public highway that can only be carried out by Norfolk County Council as Highway Authority unless otherwise agreed in writing. It is an OFFENCE to carry out any works within the Public Highway, which includes a Public Right of Way, without the permission of the Highway Authority. Please note that it is the Applicants' responsibility to ensure that, in addition to planning permission, any necessary consents or approvals under the Highways Act 1980 and the New Roads and Street Works Act 1991 are also obtained from the County Council.
This planning permission is subject to a Section 106 Agreement under the Town and Country Planning Act dated the 5th April 2017 and should be read inconjunction with that agreement. |