| No. | Condition Text |
|---|
| 1. | The development must be begun not later than three years beginning with the date of this permission.
The reason for the condition is :-
The time limit condition is imposed in order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
| 2. | The development shall be carried out in accordance with the application form and approved plan received by the Local Planning Authority on 18 September 2015.
The reason for the condition is :-
For the avoidance of doubt. |
| 3. | The removal of the partition referenced as number 4 under the scope of works on the drawing sq20/01 received by the Local Planning Authority on the 18 September 2015 shall not commence until a detailed scheme of repairs and making good with particular reference to the repair and reinstatement of coving has been submitted to and approved in writing by the local planning authority. The development shall be carried out in accordance with the details as approved.
The reason for the condition is :-
To ensure the internal character of the listed building is retained to an acceptable standard. |
| 4. | No mechanical or electrical service changes (including pipe and cables) shall be installed into the walls without the written consent of the Local Planning Authority.
The reason for the condition is :-
To protect the fabric of the building should addition electrical and plumping works be required. |
| 5. | Prior to the instalation of the flood shutters referenced under the scope of works on the drawing sq20/01 recieved by the Local Planning Authority on the 18 September 2015 a detailed scheme of the type and fittings of the flood shutters shall submitted to and approved in writing by the local planning authority. The development shall be carried out in accordance with the details as approved.
The reason for the condition is :-
To ensure the external character of the listed building is retained to an acceptable standard. |
| 6. | This permission grants consent to the works listed on the scope of works submitted within the application and the flood shutters shown on drawing sq20/01 received by the Local Planning Authority on the 18 September 2015 only and does not provide consent to any other work requiring listed building consent.
The reason for the condition is :-
In the interests of clarity and the preservation of a listed building. |
| 7. | REASON FOR APPROVAL OF THE APPLICATION :-
The proposal meets the criteria outlined in policy BNV5 of the Borough Wide Local Plan and is recommended for approval. |
| 8. | STATEMENT OF POSITIVE ENGAGEMENT: In dealing with this application Great Yarmouth Borough Council has actively sought to work with the applicant in a positive and proactive manner, in accordance with paragraphs 186 and 187 of the NPPF. |