| No. | Condition Text |
|---|
| 1. | The development must be begun not later than three years beginning with the date of this permission.
The reason for the condition is :-
The time limit condition is imposed in order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
| 2. | Prior to the commencement of the development hereby approved the site shall be investigated for landfill gas and the investigation shall be documented in wrting. The written investigation shall be submitted to and approved by the Local Planning Authority in conjunction with the Group Manager Environmental Health. The written report is to include mitigation measures should gas be found.
The reason for the condition is:-
To ensure a satisfactory for of development with adequate protection measures identified to be implemented. |
| 3. | Prior to the occupation of the buildings hereby approved the mitigation measures agreed at condition 2 of this planning permission shall be implemented in their entirety and shall remain in perpetuity.
The reason for the condition is:-
To ensure a satisfactory for of development with adequate protection measures n relation to landfill gas. |
| 4. | The development shall be carried out in accordance with the revised plan received by the Local Planning Authority on the 7th September 2015 and the plans and forms received on the 7th July 2015.
The reason for the condition is :-
For the avoidance of doubt. |
| 5. | Prior to the commencement of the development hereby approved details of the finished floor levels and existing and proposed ground levels shall be submitted to and approved by the Local Planning Authority.
The reason for the condition is :-
To ensure a satisfactory form of development which is in keeping with the character of the area. |
| 6. | No external lights are to be erected prior to details of type, lux, location and hours of operation being submitted to and approved by the Local Planning Authority.
The reason for the condition is:-
To ensure that there is no light spill to the carriageway or excessive lighting applied to the development. |
| 7. | Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015 (or any order revoking and re-enacting the order) the buildings hereby permitted shall not change to residential use, (C3) without the prior written approval of the Local Authority.
The reason for the condition is:-
In the interests of the residential amenities of the occupiers of the adjacent property. |
| 8. | Prior to the first occupation of the development hereby permitted the vehicular access shall be laid out in the position shown on the approved plan (drawing number 153-P-002 Rev1) in accordance with the highway specification attached for an industrial access with 8m kerbed radii. Arrangement shall be made for surface water drainage to be intercepted and disposed of separately so that it does not discharge from or onto the highway carriageway.
The reason for the condition is :-
To ensure satisfactory access into the site and avoid carriage of extraneous material or surface water from or onto the highway. |
| 9. | Vehicular and pedestrian (and cyclist) access to and egress from the adjoining highway shall be limited to the access(es) shown on drawing number 153-P-002 Rev1 only. Any other access(es) or egresses shall be permanently closed, and the footway / highway verge shall be reinstated in accordance with a detailed scheme to be agreed with the Local Planning Authority in consultation with the Highway Authority, concurrently with the bringing into use of the new access.
The reason for the condition is :-
In the interests of highway safety. |
| 10. | Prior to the first occupation of the development hereby permitted the proposed access, on-site car and cycle parking, servicing , loading, unloading and turning area shall be laid out, demarcated, levelled, surfaced and drained in accordance with the approved plan and retained thereafter available for that specific use.
The reason for the condition is :-
To ensure the permanent availability of the parking/manoeuvring area, in the interests of highway safety. |
| 11. | Prior to the first commencement if the development hereby permitted signing shall be provided to indicate no through traffic permitted in accordance with a detailed scheme to be agreed with the Local Planning Authority in consultation with the Highway Authority.
The reason for the condition is:-
In the interests of highway safety. |
| 12. | Prior to the first occupation of the development hereby permitted a system of automatic rising bollards shall be provided as indicated on drawing number 153-P-002 Rev1.
The reason for the condition is:-
To prevent through movement of traffic in the development in the interests of highway safety and satisfactory development. |
| 13. | Prior to the commencement of the development a surface water management strategy shall be submitted to and approved by the Local Planning Authority. No hard standing areas are to be constructed until the works have been carried out in accordance with the approved surface water strategy unless otherwise agreed in writing by the Local Planning Authority.
The reason for the condition is:-
To prevent environmental and amenity problems arsing from flooding. |
| 14. | Prior to the commencement of the development details of soft landscaping are to be submitted to and approved by the Local Planning Authority. Landscaping shall be carried out as approved prior to occupation of the development hereby approved.
The reason for the condition is:-
In the interest of the amenity of the area. |
| 15. | It is an OFFENCE to carry out any works within the Public Highway, which includes a Public Right of Way, without the permission of the Highway Authority This development involves work to the public highway that can only be undertaken by the County Council within the scope of a legal Agreement with the applicant. Please note that it is the applicants' responsibility to ensure that, in addition to planning permission, any necessary Agreements under the Highways Act 1980 are also obtained. Advice on this matter can be obtained from the County Council's Highways Development Control Group based at County Hall in Norwich. Please contact Developer Services on 0344 800 8020.
If required, street furniture will need to be repositioned at the Applicants own expense.
Public Utility apparatus may be affected by this proposal. Contact the appropriate utility service to reach agreement on any necessary alterations, which have to be carried out at the expense of the developer. |