No.Condition Text
1.No development whatsoever shall take place until full details of the appearance and landscaping of the development (herein after referred to as the reserved matters) have been submitted to and approved by the Local Planning Authority and the development shall be carried out strictly in accordance with such approved details. The reason for the condition is:- Such details have not been submitted as part of this application.
2.Application for approval of reserved matters must be made not later than the expiration of three years beginning with the date of this permission and the development must be begun not later than the expiration of two years from the final approval of the reserved matters or, in the case of approval on different dates, the final approval of the last such matter to be approved. The reason for this condition:- The time limit condition is imposed in order to comply with the requirements of Section 92 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.
3.The dwellings hereby permitted shall not be occupied until the proposed access and on-site car parking has been laid out, demarcated, levelled, surfaced and drained in accordance with details to be submitted to and approved by the Local Planning Authority. The access and parking areas shall be retained thereafter available for that specific use. The reason for the condition is :- To ensure the permanent availability of the parking/manoeuvring areas, in the interests of highway safety.
4.No work shall commence until a scheme detailing provision for on-site parking for construction workers for the duration of the construction period has been submitted to and approved in writing by the Local Planning Authority (including having a temporary closure order in place if required). The scheme, as approved, shall be implemented throughout the construction period. The reason for the condition is :- To ensure adequate off-street parking during construction in the interests of highway safety and so as not to cause obstruction to a Public Right of Way.
5.Prior to the commencement of any works a Construction Traffic Management Plan and Access Route, which shall incorporate adequate provision for addressing any abnormal wear and tear to the highway (including the Public Right of Way, Bridleway BR4), maintaining rights of access, the nature and timing of deliveries and/or any temporary closure order shall be submitted to and approved in writing by the Local Planning Authority in consultation with Norfolk County Council Highway Authority together with proposals to control and manage construction traffic using the 'Construction Traffic Access Route' and to ensure no other local roads are used by construction traffic. The reason for the condition is :- In the interests of maintaining highway efficiency and safety.
6.For the duration of the construction period all traffic associated with the construction of the development shall comply with the agreed Construction Traffic Management Plan and use only the 'Construction Traffic Access Route' and no other local roads unless approved in writing with the Local Planning Authority in consultation with the Highway Authority The reason for the condition is :- In the interests of maintaining highway efficiency and safety.
7.Notwithstanding the details indicated on the submitted drawings, no works shall commence on site, unless otherwise agreed in writing, until a detailed scheme for the off-site highway improvement works, namely edge of carriageway/centre line markings, have been submitted to and approved in writing by the Local Planning Authority in consultation with the Highway Authority. The reason for the condition is :- To ensure that the highway improvement works are designed to an appropriate standard in the interest of highway safety and to protect the environment of the local highway corridor.
8.The dwellings hereby permitted shall not be occupied until the off-site highway improvement works referred to in condition 7 of this permission have been completed to the written satisfaction of the Local Planning Authority in consultation with the Highway Authority. The reason for the condition is :- To ensure that the highway network is adequate to cater for the development proposed.
9.A pre and post construction survey of the surface condition of the right of way (Bridleway BR4) shall be undertaken in conjunction with the County Council's Public Rights of Way Officer (PROW) and any damage that occurs shall be duly rectified commensurate to the use of the bridleway in agreement with the PROW prior to the first occupation of the dwellings. The reason for the condition is :- To ensure and maintain the surface the surface condition of the bridleway commensurate with its use in the interest of highway safety.
10.Notwithstanding the provisions of Class A of Schedule 2, Part 2 of the Town and Country Planning (General Permitted Development) (England) Order 2015, (or any Order revoking, amending or re-enacting that Order) no gates, bollard, chain or other means of obstruction shall be erected across the approved access unless details have first been submitted to and approved by the Local Planning Authority. The reason for the condition is :- In the interests of highway safety.
11.The dwellings shall be of single storey construction only and notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015 (or any order revoking and re-enacting that Order with or without modification), no dormer windows or other openings to the roofspace shall be provided without the prior consent of the Local Planning Authority. The reason for the condition is:- In the interests of the residential amenities of the occupiers of adjacent residential properties.
12.Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015 (or any order revoking and re-enacting the order) no extensions to the dwellings hereby permitted shall be built without the prior consent of the Local Planning Authority. The reason for the condition is:- In the interests of the residential amenities of the occupiers of the adjacent property.
13.Construction work shall not take place outside the following hours:- 07:30 to 18:00 Monday to Friday 08:00 to 13:00 Saturday and no work shall take place on Sundays or Bank Holidays. (These hours shall only apply to work generating noise that is audible at the boundary of the nearest noise sensitive property) The reason for the condition is :- In the interests of the residential amenities of the occupiers of nearby dwellings.
14.REASON FOR APPROVAL OF THE APPLICATION :- The proposals meet the criteria for new housing development set out in Policies HOU7, HOU15 and HOU17 of the Great Yarmouth Borough-Wide Local Plan.
15.STATEMENT OF POSITIVE ENGAGEMENT: In dealing with this application Great Yarmouth Borough Council has actively sought to work with the applicant in a positive and proactive manner, in accordance with paragraphs 186 and 187 of the NPPF.
16.NOTES - Please read the following notes carefully:- It is an OFFENCE to carry out any works within the Public Highway, which includes a Public Right of Way, without the permission of the Highway Authority. This development involves work to the public highway that can only be undertaken within the scope of a Legal Agreement between the applicant and the County Council. Please note that it is the applicant's responsibility to ensure that, in addition to planning permission, any necessary Agreements under the Highways Act 1980 are also obtained. Advice on this matter can be obtained from the County Council's Highways Development Management Group based at County Hall in Norwich. Please contact Stuart French on 0344 800 8020. Public Utility apparatus may be affected by this proposal. Contact the appropriate utility service to reach agreement on any necessary alterations, which have to be carried out at the expense of the developer. If required, street furniture will need to be repositioned at the applicant's expense.