| No. | Condition Text |
|---|
| 1. | The development must be begun not later than three years beginning with the date of this permission.
The reason for the condition is :-
Required to be imposed pursuant to Section 51 of the Planning and Compulsory Purchase Act 2004. |
| 2. | Prior to the first occupation of the development hereby permitted any access gate(s), bollard, chain or other means of obstruction shall be hung to open inwards and set back, and thereafter retained a minimum distance of 5 metres from the near channel edge of the adjacent carriageway.
The reason for the condition is:-
To enable vehicles to safely draw off the highway before the gate(s) or obstruction is opened. |
| 3. | Prior to the first occupation of the development hereby permitted proposed access on-site car parking and turning area shall be laid out, demarcated, levelled, surfaced and drained in accordance with the approved plan and retained thereafter available for that specific use.
The reason for the condition is:-
To ensure the permanent availability of the parking manoeuvring area, in the interests of highway safety. |
| 4. | Demolition and construction work shall not take place outside the following hours:-
08:00 to 18:00 Monday to Friday
08:30 to 13:30 Saturday
and no work shall take place on Sundays or Bank Holidays.
(These hours shall only apply to work generating noise that is audible at the boundary of the nearest noise sensitive property)
The reason for the condition is :-
In the interests of the residential amenities of the occupiers of nearby dwellings. |
| 5. | No works shall commence on site until such time as details of the slab levels of the dwellings in relation to existing ground levels have been submitted to and approved by the Local Planning Authority.
The reason for the condition is:-
To ensure that the development takes place in the manner contemplated by the Local Planning Authority and to retain control over any significant changes in levels within the site. |
| 6. | The development shall be carried out in accordance with the plan and forms received by the Local Planning Authority on the 22nd April 2015.
The reason for the condition is :-
For the avoidance of doubt. |
| 7. | REASON FOR APPROVAL OF THE APPLICATION :-
The proposals meet the criteria for new housing development set out in Policy HOU7 of the adopted Great Yarmouth Borough-wide Local Plan. |
| 8. | STATEMENT OF POSITIVE ENGAGEMENT: In dealing with this application Great Yarmouth Borough Council has actively sought to work with the applicant in a positive and proactive manner, in accordance with paragraphs 186 and 187 of the NPPF. |