| No. | Condition Text |
|---|
| 1. | No development whatsoever shall take place until full details of the siting, layout, scale, design, external appearance and landscaping of the development (herein after referred to as the reserved matters) have been submitted to and approved by the Local Planning Authority and the development shall be carried out strictly in accordance with such approved details.
The reason for the condition is:-
Such details have not been submitted as part of this application. |
| 2. | Application for approval of reserved matters must be made not later than the expiration of one years beginning with the date of this permission and the development must be begun not later than the expiration of one year from the final approval of the reserved matters or, in the case of approval on different dates, the final approval of the last such matter to be approved.
The reason for this condition is:-
The time limit condition is imposed in order to comply with the requirements of Section 92 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
| 3. | Prior to the commencement of the development hereby permitted full details (in the form of scaled plans and / or written specifications) shall be submitted to and approved in writing by the Local Planning Authority in consultation with the Highway Authority to illustrate the following:
I. Roads, footways, cycleways, foul and on-site water drainage
II. Access arrangements
III. Parking provision in accordance with adopted standard
IV. Turning areas.
The reason for this condition :-
In the interests of highways safety and adequate development as these details were not submitted as part of the application. |
| 4. | No development shall take place outside of the following hours:
07:30 to 18:00 hours Monday to Friday.
08:30 to 13:30 hours Saturday.
No working on a Sunday or Bank Holiday.
The reason for the condition is:-
In the interest of the amenities of the nearby residents. |
| 5. | Prior to the commencement of the development finished floor levels shall be submitted to and approved by the Local Planning Authority.
The reason for the condition is:-
To ensure that the height of the proposed dwellings is in keeping with the character of the area. |
| 6. | Prior to the commencement of the development details of the proposed boundary treatments shall be submitted to and approved by the Local Planning Authority.
The reason for the condition is :-
These details were not submitted as part of the application. |
| 7. | This permission grants outline planning permission for a maximum of ten single storey dwellings only. Notwithstanding the provisions of the Town and Country (General Permitted Development) Order 2015 (or any order revoking and re-enacting that Order with or without modification), no dormer windows or other openings to the roof space shall be provided unless otherwise specified in writing by the Local planning Authority.
The reason for this condition:-
In the interests of the amenities of the neighbouring dwellings and to preserve the character of the area. |
| 8. | Prior to the commencement of the development percolation tests shall be submitted to and approved by the Local Planning Authority.
The reason for the condition is :-
They were not submitted as part of the application and are required to demonstrate that the drainage scheme is acceptable. |
| 9. | Prior to the commencement of the development a sustainable surface water drainage design shall be submitted to and approved in writing by the Local Authority. The surface water drainage shall be carried out in accordance with the approved design prior to the occupation of any of the dwellings hereby approved unless otherwise agreed in writing by the Local Planning Authority.
The reason for the condition is:-
To ensure satisfactory surface water drainage of the site. |
| 10. | Prior to the commencement of the development details of the foul sewage disposal shall be submitted to and approved by the Local Authority.
The reason for the condition is:-
To ensure satisfactory disposal of foul sewage. |
| 11. | Prior to the commencement of the development hereby approved details of the implementation, adoption, maintenance and management of a sustainable drainage system shall be submitted to and approved by the Local Planning Authority. The details shall include a timetable for its implementation and a management and maintenance plan for the lifetime of the development which shall include the arrangements for adoption by any public body or statutory undertaker, or any other arrangements to secure the effective operation of the sustainable drainage system throughout its lifetime. If your development does not include SUDS you should demonstrate that such measures are not feasible and give details of how drainage will be dealt with. The implementation, adoption, maintenance and management of the sustainable drainage system shall be carried out in accordance with the approved details prior to the occupation of any of the dwellings hereby approved and retained as approved in perpetuity.
The reason for the condition is:-
To ensure that there is adequate management in place for the developments lifetime and in the interest of the amenities of the future occupiers of the development. |
| 12. | STATEMENT OF POSITIVE ENGAGEMENT: In dealing with this application Great Yarmouth Borough Council has actively sought to work with the applicant in a positive and proactive manner, in accordance with paragraphs 186 and 187 of the NPPF. |
| 13. | REASON FOR APPROVAL OF THE APPLICATION :-
The proposal meets the criteria for domestic additions set out in Policy CS1 and CS2 of the adopted Core Strategy and the Interim Housing Land Supply Policy. |