1.The development must be begun not later than three years beginning with the date of this permission. The reason for the condition is :- The time limit condition is imposed in order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.
2.The development shall be carried out in accordance with the application form, approved plan (reference jn.325 03) and Flood Risk Assessment received by the Local Planning Authority on 26 January 2015 and the amended drawing (referenced jn325 04 REV A) received by the Local Planning Authoirty on 27 March 2015. The reason for the condition is :- For the avoidance of doubt.
3.The bins shall not impede the use of the rear external staircase and the bins shall be stored within the designated storage area shown on drawing jn.325 03. The reason for the condition is :- In the interests of a safe fire escape.
4.Construction work shall not take place outside the following hours:- 08:00 to 18:00 Monday to Friday 08:30 to 13:30 Saturday and no work shall take place on Sundays or Bank Holidays. (These hours shall only apply to work generating noise that is audible at the boundary of the nearest noise sensitive property) The reason for the condition is :- In the interests of the residential amenities of the occupiers of nearby dwellings.
5.The floor level of the ground floor flat shall be raised to 2.63 metres AOD. A minimum habitable floor level of 2.63 AOD shall remain in perpetuity. The reason for the condition is :- In the interests of safety from flooding.
6.Prior to the commencement of the development a flood evacuation plan shall be agreed in writing with the Local Planning Authority. Any works/notices required as part of the flood plan shall be carried out in their entirety before the development is first occupied. The reason for the condition is :- To minimise the risk to occupants in the event of flooding.
7.Prior to commencement of the development hereby approved a water entry system shall be agreed in writing with the Local Planning Authority and implemented prior to first occupation. The reason for the condition is :- To minimise the risk of flooding to the occupants.
8.The Tidal Flood Risk Mitigation and Evacuation measures stated in the Flood Risk Assessment received by the Local Planning Authority on the 26 January 2015 shall be carried out prior to the occupation of the ground floor flat. The reason for the condition is :- To minimise risk to the occupants in case of flooding.
9.REASON FOR APPROVAL OF THE APPLICATION :- The proposals meet the criteria for new housing development set out in Policies HOU7 and HOU15 and the conservation policy BNV10 of the adopted Great Yarmouth Borough-wide Local Plan
10.STATEMENT OF POSITIVE ENGAGEMENT: In dealing with this application Great Yarmouth Borough Council has actively sought to work with the applicant in a positive and proactive manner, in accordance with paragraphs 186 and 187 of the NPPF.