Great Yarmouth Borough Council Portal
No.Condition Text
1.This planning permission varies condition 2 of planning permission 06/14/0184/D in relation to the surface water drainage design, drawings 4403-062.Rev D, 4403-072.RevC and 4403-078 only. The reason for the condition is:- To ensure that the planning permission pertains to the correct documents.
2.The development shall be carried out in accordance with the revised plan received by the Local Planning Authority on 11th February 2015 (reference 4403 062 rev E, 4403 071 rev B, 4403 069 rev B, 4403 065 rev B) and drawing no. 18023/10 rev B received on the 16th January 2015 and the further information reference the highway saokaway design dated the 25th February 2015. The reason for the condition is :- For the avoidance of doubt.
3.No works shall be carried out on roads, footways, cycleways, foul and surface water sewers otherwise than in accordance with the specifications of the Local Planning Authority in consultation with the Highway Authority. The reason for the condition is :- To ensure satisfactory development of the site and to ensure estate roads are constructed to a standard suitable for adoption as public highway.
4.Before any dwelling is first occupied the road(s), footway(s) and cycleway(s) shall be constructed to binder course surfacing level from the dwelling to the adjoining County road in accordance with the details to be approved in writing by the Local Planning Authority in consultation with the Highway Authority. The reason for the condition is :- To ensure satisfactory development of the site.
5.Prior to the first occupation of the development hereby permitted a visibility splay measuring 2.4 X 43 metres shall be provided to each side of the access where it meets the highway and such splays shall thereafter be maintained free from any obstruction exceeding 0.225 metres above the level of the adjacent highway carriageway. The reason for the condition is :- In the interests of highway safety.
6.Prior to the first occupation of the development hereby permitted the of-site footway between the site access and Hall Road as shown on drawing 4403 062 Rev E shall be completed. The reason for the condition is:- To ensure that the highway network is able to adequately cater for the development.
7.Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 1995 (or any order revoking and re-enacting the order) no extensions shall be built at the dwellings on plots 1, 2, 3, 4, 5, 6 and 7 without the prior consent of the Local Planning Authority. The reason for the condition is:- In the interests of the residential amenities of the occupiers of the adjacent property.
8.This development involves work to the public highway that will require the approval of the County Council as Highway Authority. It is an OFFENCE to carry out any works within the Public Highway, which includes a Public Right of Way, without the permission of the Highway Authority. Please note that it is the applicants' responsibility to ensure that, in addition to planning permission, any necessary consents or approvals under the Highways Act 1980 and the New Roads and Street Works Act 1991 are also obtained from the County Council. Advice on this matter can be obtained from the County Council's Area Managers based at (insert appropriate area contact details). Public Utility apparatus may be affected by this proposal. Contact the appropriate utility service to reach agreement on any necessary alterations, which have to be carried out at the expense of the developer.
9.NOTES - Please read the following notes carefully:- The applicant is reminded of the need to comply fully with the requirements of conditions 7, 8, 9, 10, 11, 12, 13 and 14 of planning permission 06/13/0123/O during the development of the site, furthermore the applicant should remind the future occupiers of the property on plots 1-6 of the requirements of condition 4 of the outline planning permission. The applicant is reminded that no details of landscaping have been submitted as required by condition no.2 of planning permission 06/13/0123/O and no development shall take place until these details have been agreed. This permission is subject to the requirements of an Agreement prepared under Section 106 of the Town and Country Planning Act 1990.
10.STATEMENT OF POSITIVE ENGAGEMENT: In dealing with this application Great Yarmouth Borough Council has actively sought to work with the applicant in a positive and proactive manner, in accordance with paragraphs 186 and 187 of the NPPF.
11.REASON FOR APPROVAL OF THE APPLICATION :- The proposal meets the criteria set out in the adopted Great Yarmouth Borough-wide Local Plan.