| No. | Condition Text |
|---|
| 1. | The development must be begun not later than three years beginning with the date of this permission.
The reason for the condition is :-
The time limit condition is imposed in order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
| 2. | The development shall be carried out in accordance with the plan, forms and accompanying information received by the Local Planning Authority on the 18th December 2014.
The reason for the condition is :-
For the avoidance of doubt. |
| 3. | Prior to the first occupation of the development hereby permitted a 2.4 metre wide parallel visibility splay (as measured back from the near edge of the adjacent highway carriageway) shall be provided across the whole of the site's roadside frontage. The parallel visibility splay shall thereafter be maintained at all times free from any obstruction exceeding 0.6 metres above the level of the adjacent highway carriageway.
The reason for the condition is :-
In the interests of highway safety. |
| 4. | Prior to the commencement of the use hereby permitted the proposed accesses / on-site car and cycle parking / servicing / loading, unloading / turning / waiting area shall be laid out, demarcated, levelled, hard surfaced and drained in accordance with the approved plan and retained thereafter available for that specific use.
The reason for the condition is :-
To ensure the permanent availability of the parking / manoeuvring area, in the interests of highway safety. |
| 5. | Notwithstanding the details indicated on the submitted drawings no works shall commence on site unless otherwise agreed in writing until a detailed scheme for the off-site highway improvement works (Footway linking North Quay to the north access of the site) have been submitted to and approved in writing by the Local Planning Authority in consultation with the Highway Authority.
The reason for the condition is :-
To ensure that the highway improvement works are designed to an appropriate standard in the interest of highway safety and to protect the environment of the local highway corridor. |
| 6. | Prior to the commencement of the use hereby permitted the off-site highway improvement works referred to in condition 5 of this permission shall be completed to the written satisfaction of the Local Planning Authority in consultation with the Highway Authority.
The reason for the condition is :-
To ensure that the highway network is adequate to cater for the development proposed. |
| 7. | No works shall commence on the site until the Traffic Regulation Order for parking to the southern side of Fishers Quay has been revoked by the Highway Authority
The reason for the condition is :-
In the interests of highway safety. |
| 8. | Notwithstanding the information submitted as part of the application no works shall commence until details of the lighting and the boundary treatments are submitted to and approved by the Local Planning Authority.
The Reason for the condition is:-
To ensure an adequate form of development. |
| 9. | STATEMENT OF POSITIVE ENGAGEMENT: In dealing with this application Great Yarmouth Borough Council has actively sought to work with the applicant in a positive and proactive manner, in accordance with paragraphs 186 and 187 of the NPPF. |
| 10. | NOTES - Please read the following notes carefully:-
The Environmental Permitting Regulations make it an offence to cause or knowingly permit any discharge that will result in the input of pollutants to ground or surface waters. |