| No. | Condition Text |
|---|
| 1. | The development must be begun not later than three years beginning with the date of this permission.
The reason for the condition is :-
The time limit condition is imposed in order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
| 2. | The development shall be carried out in accordance with the details contained in the planning application form and drawing no. 939/4 received on 26th August 2014, the revised drawings 939/2 rev. A and 939/3 rev. A received by the Local Planning Authority on 15th October 2014 and the garage plan 939/Gar received on 12th November 2014.
The reason for the condition is :-
For the avoidance of doubt. |
| 3. | No work shall commence until the exact type and colour of the facing bricks and roof tiles have been submitted to and approved by the Local Planning Authority.
The reason for the condition is :-
In the interests of the visual amenities of the area as precise details of these materials have not been submitted. |
| 4. | The existing trees on the site (except for those shown on drawing no. 939/3 Rev. A as being removed) shall not be removed, thinned or reduced in height without the prior consent in writing of the Local Planning Authority.
The reason for the condition is:-
The existing trees represent an important visual amenity which the Local Planning Authority consider should be substantially maintained. |
| 5. | Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 1995 (or any order revoking and re-enacting the order) no windows or other openings (except those shown on the approved drawings) shall be inserted into the walls or roofs of the dwellings hereby permitted.
The reason for the condition is:-
In the interests of the residential amenities of the occupiers of the adjacent property. |
| 6. | Construction work shall not take place outside the following hours:-
07:30 to 18:00 Monday to Friday
08:00 to 13:00 Saturday
and no work shall take place on Sundays or Bank Holidays.
(These hours shall only apply to work generating noise that is audible at the boundary of the nearest noise sensitive property)
The reason for the condition is :-
In the interests of the residential amenities of the occupiers of nearby dwellings. |
| 7. | Prior to the first occupation of the dwellings hereby permitted, the vehicular accesses (indicated for improvement on drawing no's. 939/2 rev. A and 939/3 rev. A) shall be upgraded in accordance with the Norfolk County Council residential access construction specification for the first 2 metres as measured back from the near channel edge of the adjacent carriageway. Arrangement shall be made for surface water drainage from the site to be intercepted and disposed of separately so that it does not discharge from or onto the highway carriageway.
The reason for the condition is :-
In the interests of highway safety and traffic movement. |
| 8. | Notwithstanding the submitted details, the proposed private drive shall be constructed perpendicular to the highway carriageway for a minimum length of 10 metres as measured from the near edge of the highway carriageway and shall be maintained in perpetuity at a minimum width of 5 metres for that distance.
The reason for the condition is :-
In the interest of highway safety and traffic movement. |
| 9. | Notwithstanding the provisions of Class A of Schedule 2, Part 2 of the Town and Country Planning (General Permitted Development) Order 1995, (or any Order revoking, amending or re-enacting that Order) no gates, bollard, chain or other means of obstruction shall be erected across the approved accesses unless details have first been submitted to and approved by the Local Planning Authority.
The reason for the condition is :-
In the interests of highway safety. |
| 10. | There shall be no direct vehicular or pedestrian access from or onto the public footpath to the north of the site (Filby FP3).
The reason for the condition is :-
In the interests of highway safety and traffic movement. |
| 11. | Prior to the first occupation of the development hereby permitted, a 2.0 metre wide parallel visibility splay (as measured back from the near edge of the adjacent highway carriageway) shall be provided across the whole of the site's roadside frontage. The parallel visibility splay shall thereafter be maintained at all times free from any obstruction exceeding 0.6 metres above the level of the adjacent highway carriageway.
The reason for the condition is :-
In the interests of highway safety. |
| 12. | Prior to the first occupation of the development hereby permitted, the proposed access, on-site car parking and turning areas shall be laid out, demarcated, levelled, surfaced and drained in accordance with the approved plan and retained thereafter available for that specific use.
The reason for the condition is :-
To ensure the permanent availability of the parking/manoeuvring areas, in the interests of highway safety. |
| 13. | Development shall not commence until a scheme detailing provision for on-site parking for construction workers for the duration of the construction period has been submitted to and approved in writing by the Local Planning Authority. The scheme shall be implemented throughout the construction period.
The reason for the condition is :-
To ensure adequate off street parking during construction in the interests of highway safety. |
| 14. | REASON FOR APPROVAL OF THE APPLICATION :-
The proposals meet the criteria for new housing development set out in Policies HOU7, HOU15 and HOU17 of the Great Yarmouth Borough-wide Local Plan. |
| 15. | STATEMENT OF POSITIVE ENGAGEMENT: In dealing with this application Great Yarmouth Borough Council has actively sought to work with the applicant in a positive and proactive manner, in accordance with paragraphs 186 and 187 of the NPPF. |
| 16. | NOTES - Please read the following notes carefully:-
This proposal involves excavations adjacent to the public highway. It is an OFFENCE to carry out any works that may affect the Public Highway, which includes a Public Right of Way, without the permission of the Highway Authority. Please note that it is the applicant's responsibility to ensure that, in addition to planning permission, any necessary consents or approvals under the Highways Act 1980 and the New Roads and Street Works Act 1991 are also obtained from the County Council. Please contact the Area Co-ordinator East on 0344 800 8020. |