| No. | Condition Text |
|---|
| 1. | The development must be begun not later than three years beginning with the date of this permission.
The reason for the condition is :-
The time limit condition is imposed in order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
| 2. | The development shall be carried out in accordance with the application and approved plan referenced 2379.08 recieved by the Local Planning Authority on the 19 June 2014, revised plan referenced 2379.07 recieved by the Local Planning Authority on 01 September 2014.
The reason for the condition is :-
For the avoidance of doubt. |
| 3. | The garage shall only be used for private domestic use in connection with the dwelling to which it relates.
The reason for this condtion is:-
In the interests of the residential amenities of the occupiers of adjacent property. |
| 4. | Prior to commencement of the development hereby permitted any access gate(s), bollard, chain or other means of obstruction shall be hung to open inwards, set back, and thereafter retained a minimum distance of 5 metres from the near channel edge of the adjacent carriageway. Any sidewalls to the access shall be splayed as indicated on the approved plan (2379.07 recieved by the Local Planning Authority on the 01 September 2014) from each of the (outside) gateposts to the front boundary of the site.
The reason for the condition is:
To enable vehicles to safely draw off the highway before the gate(s) or obstruction is opened. |
| 5. | No part of the proposed structure (which includes its piers and /or its foudnation) shall be erected upon or overhang the public highway.
The reason for the condition is:
In the interests of highway safety. |
| 6. | Please read the following notes carefully:
This development involves excavations adjacent to the public highway. It is an OFFENCE to carry out any works that may affect the public highway, which includes a public right of way, without the permission of the Highway Authority. Please note that it is the applicants responsibility to ensure that, in addition to planning permission, any necessary consents or approvals under the Highways Act 1980 and the New Roads and Street Works Act 1991 are also obtained from the county council. Please contact the Area Street Works co-ordinator East on 0344 800 8020.
|
| 7. | REASON FOR APPROVAL OF THE APPLICATION :-
The proposal meets the criteria for domestic additions set out in Policy HOU18 of the adopted Great Yarmouth Borough-wide Local Plan. |
| 8. | STATEMENT OF POSITIVE ENGAGEMENT: In dealing with this application Great Yarmouth Borough Council has actively sought to work with the applicant in a positive and proactive manner, in accordance with paragraphs 186 and 187 of the NPPF. |