Great Yarmouth Borough Council Portal
No.Condition Text
1.The development must be begun not later than three years beginning with the date of this permission. The reason for the condition is :- The time limit condition is imposed in order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.
2.The development hereby permitted shall be carried out in accordance with the application form, plans and Flood Risk Assessment received by the local planning authority on 8th January 2014 unless otherwise agreed in writing. The reason for the condition is :- For the avoidance of doubt.
3.No development shall take place outside the following hours: 08:00 hours to 18:00 hours Monday to Friday 08:30 hours to 13:30 hours Saturdays No work on Sundays or Bank Holidays The reason for the condition is :- To ensure the amenities of adjacent residents are not affected to any significant degree.
4.REASON FOR APPROVAL OF THE APPLICATION :- The proposal meets the criteria of policies BVN18 & HOU23 of the adopted Great Yarmouth Borough Wide Local Plan.
5.NOTES - Please read the following notes from Environmental Health carefully:- INTERNAL LAYOUT: The proposed internal layout should be revised or the bedrooms be fitted with egress windows which comply with Building Regulations. ROOM SIZES: The internal dimensions of all rooms within the self-contained flats shall comply with the minimum requirements of the Council's standards for this type of property and expected occupancy of each dwelling. A copy of these standards is available from Environmental Health. HEATING: The individual dwellings are to be equipped with a whole-dwelling heating system that is capable of heating the rooms that comprise the individual dwelling to an average temperature of 21 degrees C and maintaining that temperature when the outside temperature of -1 degree C. Any heating system installed must be of energy efficient design and economical to operate. VENTILATION: Adequate mechanical ventilation must be provided to all bathrooms and kitchens. Mechanical ventilation must have a 'whisper-quiet' operation and meet with current Building Regulations. LOCAL AIR QUALITY: The site will potentially generate a significant amount of dust during the construction process: therefore, the following measures should be employed:- - An adequate supply of water shall be available for suppressing dust; - Mechanical cutting equipment with integral dust suppression should be used; - There should be no burning of any materials on site. ADVISORY NOTE: The applicant is strongly recommended to advise neighbouring residential occupiers of the proposals, together with contact details in the event of problems.
6.STATEMENT OF POSITIVE ENGAGEMENT: In dealing with this application Great Yarmouth Borough Council has actively sought to work with the applicant in a positive and proactive manner, in accordance with paragraphs 186 and 187 of the NPPF.