| No. | Condition Text |
|---|
| 1. | The development must be begun not later than three years beginning with the date of this permission.
The reason for the condition is :-
The time limit condition is imposed in order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
| 2. | The development shall be carried out in accordance with the revised drawing 2369.01 revision A received by the Local Planning Authority on 20th January 2014.
The reason for the condition is :-
For the avoidance of doubt. |
| 3. | No part of the proposed structure shall overhang or encroach upon highway land and no gate or door, if installed, shall open outwards over the highway.
The reason for the condition is :-
In the interests of highway safety. |
| 4. | Prior to the commencement of the use hereby permitted, the vehicular access (indicated for improvement on drawing 2369.01 revision A) shall be widened to a minimum width of 4.5m in accordance with the Norfolk County Council residential access construction specification for the full depth of the public footway. Arrangement shall be made for surface water drainage from the site to be intercepted and disposed of separately so that it does not discharge from or onto the highway carriageway.
The reason for the condition is :-
In the interest of highway safety and traffic movement. |
| 5. | REASON FOR APPROVAL OF THE APPLICATION :-
The proposal meets the criteria for domestic additions set out in Policy HOU18 of the adopted Great Yarmouth Borough-wide Local Plan. |
| 6. | STATEMENT OF POSITIVE ENGAGEMENT: In dealing with this application Great Yarmouth Borough Council has actively sought to work with the applicant in a positive and proactive manner, in accordance with paragraphs 186 and 187 of the NPPF. |
| 7. | NOTES - Please read the following notes carefully:-
This development involves works within the public highway that can only be carried out by Norfolk County Council as Highway Authority unless otherwise agreed in writing.
It is an OFFENCE to carry out any works within the Public Highway, which includes a Public Right of Way, without the permission of the Highway Authority. Please note that it is the applicant's responsibility to ensure that, in addition to planning permission, any necessary consents or approvals under the Highways Act 1980 and the New Roads and Street Works Act 1991 are also obtained from the County Council. Advice on this matter can be obtained from the County Council's Highway Management Group. Please contact Stuart French on 0344 800 8020.
If required, street furniture will need to be repositioned at the applicant's expense.
Public Utility apparatus may be affected by this proposal. Contact the appropriate utility service to reach agreement on any necessary alterations, which have to be carried out at the expense of the developer. |