Great Yarmouth Borough Council Portal
No.Condition Text
1.The development must be begun not later than three years beginning with the date of this permission. The reason for the condition is :- The time limit condition is imposed in order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.
2.The development shall be carried out in accordance with the details contained in the planning application forms and proposed drawings received by the Local Planning Authority on 26th November 2013. The reason for the condition is :- For the avoidance of doubt.
3.No work shall commence until the exact type and colour of the facing bricks and roof tiles have been submitted to and approved by the Local Planning Authority. The reason for the condition is :- In the interests of the visual amenities of the area as precise details of these materials have not been submitted.
4.Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 1995 (or any order revoking and re-enacting the order) no fence, wall or other means of enclosure exceeding 1 metre in height (except where shown on the approved plan) shall be erected along the side boundaries of the plot. The reason for the condition is:- In the interests of the residential amenities of the occupiers of the adjacent property.
5.The dwellings hereby permitted shall not be occupied until the vehicular access to each dwelling has been laid out in the position shown on the approved plan. The construction specification, from the property boundary to the near channel edge of the carriageway, shall be in accordance with details to be approved in writing by the Local Planning Authority in consultation with the Highway Authority. Arrangement shall be made for surface water drainage to be intercepted and disposed of separately so that it does not discharge from or onto the highway carriageway. The reason for the condition is :- To ensure satisfactory access into the site and avoid carriage of extraneous material or surface water from or onto the highway.
6.Notwithstanding the provision of Class A of Schedule 2, Part 2 of the Town and Country Planning (General Permitted Development) Order 1995, (or any Order revoking, amending or re-enacting that Order) no gates, bollards, chains or other means of obstruction shall be erected across the approved accesses unless details have first been submitted to and approved in writing by the Local Planning Authority. The reason for the condition is :- In the interests of highway safety.
7.The dwellings hereby permitted shall not be occupied until the vehicular accesses and on-site car parking areas have been laid out, levelled, surfaced and drained in accordance with details to be submitted to and approved by the Local Planning Authority and shall be retained thereafter available for that specific use. The reason for the condition is :- To ensure the permanent availability of the parking areas, in the interests of highway safety.
8.The dwellings hereby permitted shall not be occupied until a 2.4 metre wide parallel visibility splay (as measured back from the near edge of the adjacent highway carriageway) has been provided across the whole of the site's roadside frontage. The parallel visibility splay shall thereafter be maintained free from any obstruction exceeding 0.6 metres above the level of the adjacent highway carriageway. The reason for the condition is :- In the interests of highway safety.
9.Construction work shall not take place outside the following hours:- 08:00 to 18:00 Monday to Friday 09:00 to 13:00 Saturday and no work shall take place on Sundays or Bank Holidays. (These hours shall only apply to work generating noise that is audible at the boundary of the nearest noise sensitive property) The reason for the condition is :- In the interests of the residential amenities of the occupiers of nearby dwellings.
10.REASON FOR APPROVAL OF THE APPLICATION :- The proposals meet the criteria for new housing development set out in Policies HOU7, HOU15 and HOU17 of the adopted Great Yarmouth Borough-wide Local Plan.
11.STATEMENT OF POSITIVE ENGAGEMENT: In dealing with this application Great Yarmouth Borough Council has actively sought to work with the applicant in a positive and proactive manner, in accordance with paragraphs 186 and 187 of the NPPF.
12.NOTES - Please read the following notes carefully:- This development involves works within the public highway that can only be carried out by Norfolk County Council as Highway Authority unless otherwise agreed in writing. It is an OFFENCE to carry out any works within the Public Highway, which includes a Public Right of Way, without the permission of the Highway Authority. Please note that it is the applicant's responsibility to ensure that, in addition to planning permission, any necessary consents or approvals under the Highways Act 1980 and the New Roads and Street Works Act 1991 are also obtained from the County Council. Advice on this matter can be obtained from the County Council's Highway Development Management Group. Please contact Stuart French on 0344 800 8020. If required, street furniture will need to be repositioned at the applicant's expense. Public Utility apparatus may be affected by this proposal. Contact the appropriate utility service to reach agreement on any necessary alterations, which will have to be carried out at the expense of the developer.