| No. | Condition Text |
|---|
| 1. | The development must be begun not later than three years beginning with the date of this permission.
The reason for the condition is :-
The time limit condition is imposed in order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
| 2. | The development hereby permitted shall be carried out in accordance with the application form, flood response plan and plans numbered 2153/2013/1 received by the local planning authority on 26th September 2013 unless first submitted and approved in writing.
The reason for the condition is :-
For the avoidance of doubt. |
| 3. | No development shall take place until precise details of the location, ventilation and extraction systems are submitted to and approved in writing by the local planning authority. The submitted details shall include design, operation and maintenance of the system and any discharge stack, if installedm shall discharge the extracted air not less than 1 metre above the roof ride.
The reason for the condition is :-
For the avoidance of doubt and to ensure the satisfactory installation and maintenance of the extraction system. |
| 4. | The flue installation and ventilation canopy hereby approved shall not be operated putside the following hours:
Monday to to Sunday 06:30 to 17:00 hours*
(*Exemptions to these hours will be permitted when the fan needs to be operated to allow for unforeseen safety matters that may arise)
The reason for the condition is :-
To prevent noise disturbance to adjacent residents. |
| 5. | A minimum vertical clearance of 2.4 metres shall be maintained at all times between the proposed structure (the extractor flue) and the level of the adjacent public highway.
The reason for the condition is :-
In the interests of highway safety. |
| 6. | No works shall commence on the site until an application to the Highway Authority has been made for and a license secured (subject to any conditions attached thereto) for the structure (the extractor flue) under Section 177 of the Highway Act 1980.
The reason for the condition is :-
In the interests of highway safety. |
| 7. | Notwithstanding any conditions attached to any license issued under Section 177 of the Highways Act 1980, the structure (the extractor flue) shall be regularly maintained and inspected in accordance with manufactureres recommendations and an annual (or as conditioned in any license granted) survey and report shall be commisioned by the licensee by a reputable structural engineer, and submitted to the Highway Authority, to prove the ongoing integrity of the structure.
The reason for the condition is :-
In the interests of highway safety. |
| 8. | REASON FOR APPROVAL OF THE APPLICATION :-
The proposal meets the criteria of policies BNV18, EMP8 & SHP8 of the adopted Great Yarmouth Borough Wide Local Plan. |
| 9. | This development involves a structure that may affect the public highway and is which subject to a license to permit the structure over the public highway under Section 177 of the Highways Act. The Applicant should note that the Norfolk County Council, as Highway Authority, consider and grant such licences. Advice on this matter can be obtained from the County Council¿s Highways Network Manager, County Hall, Martineau Lane, Norwich, NR1 2SG (Tel: 0344 8008020). |
| 10. | NOTES - Please read the following notes from Environmental Health carefully:-
To prevent odour nuisance and to ensure extracted air is effectively discharged away from residential properties to flue to the extract system should terminate as a minimum not less than 1 metre above the level of the roof.
The design of the flue duct must be such that there is access to all parts of the installation for cleaning and maintenance.
The flue installation and odour control equipment muct be maintained and cleaned at intervals required by the manufacturers of the equipment. |
| 11. | STATEMENT OF POSITIVE ENGAGEMENT: In dealing with this application Great Yarmouth Borough Council has actively sought to work with the applicant in a positive and proactive manner, in accordance with paragraphs 186 and 187 of the NPPF. |