| No. | Condition Text |
|---|
| 1. | No development whatsoever shall take place until full details of the layout, scale, appearance, access to and landscaping of the development (herein after referred to as the reserved matters) have been submitted to and approved by the Local Planning Authority and the development shall be carried out strictly in accordance with such approved details.
The reason for the condition is:-
Such details have not been submitted as part of this application. |
| 2. | Application for approval of reserved matters must be made not later than the expiration of three years beginning with the date of this permission and the development must be begun not later than whichever is the later of the following dates:- a) the expiration of five years from the date of this permission; or b) the expiration of two years from the final approval of the reserved matters or, in the case of approval on different dates, the final approval of the last such matter to be approved.
The reason for this condition:-
Required to be imposed pursuant to Section 92 of the Town and Country Planning Act 1990. |
| 3. | The development hereby permitted in terms of the layout of the dwelling, garage and highway access shall be carried out in accordance with the plan (drawing no.060 revision B) received by the Local Planning Authority on the 24th September 2013 and the Arboricultural Impact Assessment received on the 12th December 2013.
The reason for the condition is :-
For the avoidance of doubt. |
| 4. | Prior to the first occupation of the development hereby permitted a visibility splay shall be provided in full accordance with the details indicated on the approved plan. The splay shall thereafter be maintained free from any obstruction exceeding 0.6 metres above the level of the adjacent highway carriageway.
The reason for the condition is:-
In the interests of highway safety. |
| 5. | Notwithstanding the provision of Class A of Schedule 2, Part 2 of the Town and Country Planning (General Permitted Development) Order 1995, (or any Order revoking, amending or re-enacting that Order) no gates, bollard, chain or other means of obstruction shall be erected across the approved access unless details have first been submitted to and approved in writing by the Local Planning Authority.
The reason for the condition is :-
In the interests of highway safety. |
| 6. | Prior to the first occupation of the development hereby permitted the proposed access, on-site car parking and waiting area shall be laid out, demarcated, levelled, surfaced and drained in accordance with the approved plan and retained thereafter available for that specific use.
The reason for the condition is:-
To ensure the permanent availability of the parking manoeuvring area, in the interests of highway safety. |
| 7. | No works or development shall take place until all existing trees have been protected by the erection of a one metre high chestnut paling fence to be positioned beneath the extremities of the crown spread, to the satisfaction of the local planning authority, or in the case of fastigiated trees in a position to be agreed with the local planning authority. All such fencing shall be retained and maintained in good condition for the duration of the construction period.
During the construction period:
(a) the storage of vehicles, fuel, materials, site huts or other buildings or ancillary equipment will not take place within the fenced areas.
(b) The existing ground levels within the fenced areas will not be raised or lowered;
(c) No services shall be laid within the fenced areas;
(d) No trees shall be lopped, topped or felled without the prior written consent of the local planning authority.
The reason for the condition is :-
To ensure the existing trees are protected during site works in the interests of the visual amenity of the area and the satisfactory appearance of the development in accordance with NNV10 of the Great Yarmouth Borough-Wide Local Plan. |
| 8. | A) No demolition/development shall take place/commence until a Written Scheme of Investigation has been submitted to and approved by the local planning authority in writing. The scheme shall include an assessment of significance and research questions; and
1. The programme and methodology of site investigation and recording
2. The programme for post investigation assessment
3. Provision to be made for analysis of the site investigation and recording
4. Provision to be made for publication and dissemination of the analysis and records of the site investigation
5. Provision to be made for archive deposition of the analysis and records of the site investigation
6. Nomination of a competent person or persons/organization to undertake the works set out within the Written Scheme of Investigation
B) No demolition/development shall take place other than in accordance with the Written Scheme of Investigation approved under condition (A).
C) The development shall not be occupied until the site investigation and post investigation assessment has been completed in accordance with the programme set out in the Written Scheme of Investigation approved under condition (A) and the provision to be made for analysis, publication and dissemination of results and archive deposition has been secured.
The reason for the condition is :-
To ensure that the development is carried out in accordance with NPPF with specific reference paragraph 141. |
| 9. | Foul drainage shall not be discharged other than to the foul sewer. Surface water drainage shall be discharged in accordance with details which shall incorporate fully sustainable methods, to be submitted to and approved by the Local Planning Authority before any work takes place on the site and the system as approved shall be completed prior to the building being brought into use and thereafter maintained in accordance with the approved details.
The reason for the condition is :-
In order to effect satisfactory drainage arrangements both on and from the site and to ensure the provision of a sustainable drainage system to deal with surface water disposal |
| 10. | Prior to the commencement of the development and to the satisfaction of the Local Planning Authority in consultation with the Environmental Health Officer, a site investigation shall be carried out to assess the extent (if any) to which the ground waters underlying the site are contaminated by virtue of the previous uses of the site. The investigation shall include a desktop study detailing the previous uses and a risk assessment including a conceptual model of the likely effect of contaminants. If necessary a fully intrusive site investigation shall be carried out where contamination is found to exist provide a validated remediation strategy
The reason for the condition is :-
To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors. |
| 11. | STATEMENT OF POSITIVE ENGAGEMENT: In dealing with this application Great Yarmouth Borough Council has actively sought to work with the applicant in a positive and proactive manner, in accordance with paragraphs 186 and 187 of the NPPF. |
| 12. | The proposal meets the criteria for new housing set out in Policy HOU15, HOU7 TCM13, NNV2 and BNV16 of the adopted Great Yarmouth Borough-wide Local Plan. |
| 13. | Notes:
The Historic Environment Service will provide a brief for the work required to comply with condition 8 of this planning permission on request. The case officer is Kelly Powell who can be contacted as follows: