No.Condition Text
1.The development must be begun not later than three years beginning with the date of this permission. The reason for the condition is :- The time limit condition is imposed in order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.
2.The development shall be carried out in accordance with the revised plan received by the Local Planning Authority on the 11th September 2013 (drawing reference 852/1). The reason for the condition is :- For the avoidance of doubt.
3.Prior to commencement of the use hereby permitted any access gate(s), bollard, chain or other means of obstruction shall be hung to open inwards and set back, and thereafter retained a minimum distance of 5 metres from the near channel edge of the adjacent carriageway. Any sidewalls / fences / hedges adjacent to the access shall be splayed at an angle of 45 degrees from each of the (outside) gateposts to the front boundary of the site. The reason for the condition is :- To enable vehicles to safely draw off the highway before the gate(s) or obstruction is opened.
4.Prior to the commencement of the use hereby permitted the proposed access, on site car parking and turning area shall be laid out, demarcated, levelled, surfaced and drained in accordance with the approved plan and retained thereafter available for that specific use. The reason for the condition is :- To ensure the permanent availability of the parking manoeuvring area, in the interests of highway safety.
5.REASON FOR APPROVAL OF THE APPLICATION :- The proposal meets the criteria for domestic additions set out in Policy HOU18 of the adopted Great Yarmouth Borough-wide Local Plan.
6.STATEMENT OF POSITIVE ENGAGEMENT: In dealing with this application Great Yarmouth Borough Council has actively sought to work with the applicant in a positive and proactive manner, in accordance with paragraphs 186 and 187 of the NPPF.
7.NOTES - Please read the following notes carefully:- This proposal involves excavations adjacent to the public highway. It is an OFFENCE to carry out any works that may affect the Public Highway, which includes a Public Right of Way, without the permission of the Highway Authority. Please note that it is the applicants' responsibility to ensure that, in addition to planning permission, any necessary consents or approvals under the Highways Act 1980 and the New Roads and Street Works Act 1991 are also obtained from the County Council. Please contact the Street Works Co-ordinator on 0344 800 8020.