| No. | Condition Text |
|---|
| 1. | The development must be begun not later than three years beginning with the date of this permission.
The reason for the condition is :-
The time limit condition is imposed in order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
| 2. | No work shall commence until the exact type and colour of the materials have been submitted to and approved by the Local Planning Authority.
The reason for the condition is :-
In the interests of the visual amenities of the area as precise details of the materials have not been submitted. |
| 3. | The development hereby approved shall be carried out in accordance with the application form and the amended plans numbered 584.1A dated 6th September 2013 unless first submitted to and agreed in writing by the local planning authority.
The reason for the condition is :-
For the avoidance of doubt. |
| 4. | The floor levels of the development hereby permitted shall be set no lower than existing levels of 1.34 AOD and in accordance with the recommendations of the submitted Flood Risk Assessment dated June2013 and received by the locla planning authority on 34th July 2013.
The reason for the condition is :-
To ensure the safety of the occupants of the residence in times of extreme flooding. |
| 5. | Prior to the first occupation of the development hereby permitted the vehicular access shall be provided and thereafter retained at the position shown on the approved plan (Drawing number 584.1A) in accordance with the highway specification (Dwg.No. TRAD 3 - attached). Arrangement shall be made for surface water drainage to be intercepted and disposed of separately so that it does not discharge from or onto the highway carriageway.
The reason for the condition is:
To ensure satisfactory access into the site and avoid carriage of extraneous material or surface water from or onto the highway. |
| 6. | Notwithstanding the provisions of the Town and Country Planning General Permitted Development Order 1995, or any amendments thereto, garage accommodation on the site shall be provided with minimum internal dimensions measuring 3m x 7m.
The reason for the condition is:
To minimise the potential for on-street parking and thereby safeguard the interest of safety and convenience of road users. |
| 7. | Prior to the first occupation of the development hereby permitted the proposed access, on-site car and turning shall be laid out, demarcated, levelled, surfaced and drained in accordance with the approved plan and retained thereafter available for that specific use.
The reason for the condition is:
To ensure the permanent availability of the parking manoeuvring area, in the interests of highway safety. |
| 8. | No development shall take place until precise details oft he means of surface water disposal have been submitted to and approved in writing by the local planning authority. The development shall be carried out in accordance with the details as agreed.
The reason for the condition is :-
To minimise the possibility of flooding. |
| 9. | REASON FOR APPROVAL OF THE APPLICATION :-
The proposals meet the criteria for new housing development set out in Policies HOU7 and HOU15 of the adopted Great Yarmouth Borough-wide Local Plan |
| 10. | This development involves works within the public highway that can only be carried out by Norfolk County Council as Highway Authority unless otherwise agreed in writing.
It is an OFFENCE to carry out any works within the Public Highway, which includes a Public Right of Way, without the permission of the Highway Authority. Please note that it is the applicants' responsibility to ensure that, in addition to planning permission, any necessary consents or approvals under the Highways Act 1980 and the New Roads and Street Works Act 1991 are also obtained from the County Council. Advice on this matter can be obtained from the County Council's Highway Development Control Group . Please contact (insert appropriate contact details).
If required, street furniture will need to be repositioned at the applicants own expense.
Public Utility apparatus may be affected by this proposal. Contact the appropriate utility service to reach agreement on any necessary alterations, which have to be carried out at the expense of the developer.
|
| 11. | This development involves a sign that may affect the public highway. The applicant should note that the Norfolk County Council as Highway Authority reserves the right under the general provisions of Common Law and Section 152 of the Highways Act 1980 to seek the removal of any sign causing an obstruction or nuisance, or which obscures or hinders the ready interpretation of a road traffic sign. Advice on this matter can be obtained from the County Council's Highways Development Control Group based at County Hall in Norwich. Please contact (insert appropriate contact details). |
| 12. | STATEMENT OF POSITIVE ENGAGEMENT: In dealing with this application Great Yarmouth Borough Council has actively sought to work with the applicant in a positive and proactive manner, in accordance with paragraphs 186 and 187 of the NPPF. |