No.Condition Text
1.The development must be begun not later than three years beginning with the date of this permission. The reason for the condition is :- The time limit condition is imposed in order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.
2.The development hereby permitted shall be carried out in accordance with the application form, plans and Design & Access Statement submitted on 15th July 2013 and the letter dated 12th Septenmber 2013 unless first submitted to and agreed in writing by the local planning authority. The reason for the condition is :- For the avoidance of doubt.
3.No development shall take place outside the following hours: 08:00 hours to 18:00 hours Monday to Friday 08:30 hours to 13:30 hours Saturdays No work on Sundays or Bank Holidays The reason for the condition is :- To ensure the amenities of any residential dwellings and businesses in the proximity are not unduly disturbed.
4.Prior to the commencement of development of the dwellings hereby permitted a Flood Response Plan shall be devised and submitted for approval containing the following details: Provision of and adequacy of a temporary refuge Details and adequacy of flood proofing and other building level resistance and resilience measures Details and adequacy of an emergency plan Adequacy of resuce or evacuation arrangements Whether insurance can be gained or not Schedule for review of plan on an annual basis The reason for the condition is :- To ensure that the safety of future occupants is fully addressed prior to the first occupation and is maintained in the furture.
5.REASON FOR APPROVAL OF THE APPLICATION :- The proposals meet the criteria for new housing development set out in Policies HOU7 and HOU15 of the adopted Great Yarmouth Borough-wide Local Plan
6.NOTES - Please read the following notes from Environmental Health carefully:- FIRE SAFETY: Whilst the internal layout of the six proposed dwellings is not ideal by virtue of the means of escape being via a risk room (combined kitchen/living room), this may be mitigated with regard to the ground and first floor dwellings by the installation of an egress window in all of the proposed bedrooms provided a safe drop out of the first floor windows can be achieved. If a safe means of escape cannot be achieved then the internal layout should be reconsidered or alternatively a fire suppression system installed. NOISE: The proposed bedrooms are located at the front of the building and will face a busy 3-lane road. Noise from passing traffic is likely to cause regular sleep disturbance and this will have associated negative health implications for any future occupants. If the bedrooms are to remain at the front of the building then noise insulation and ventilation works should be implemented to ensure that noise levels in the bedrooms meets or betters the World Health Organisations Guideline Values for Community Noise in Specific Environments which fore bedrooms are :- 30dBL Aeq8-hour for continuous noise 45dBL LAMAX for single sound events ROOM SIZES: The internal dimensions of all rooms within the self-contained flats shall comply with the minimum requirements of the Councils standards for this type of property and expected occupancy of each dwelling. A copy of these standards is available from Environmental Health. LOCAL AIR QUALITY: The site will potentially generate a significant amount of dust during the construction process; therefore the following measures should be employed:- - An adequate supply of water shall be available for suppressing dust; - Mechanical cutting equipment with integral dust suppression should be used; - There should be no burning of any materials on site ADVISORY NOTE: The applicant is strongly recommended to advise neighbouring businesses and any residential occupiers of the proposal, together with contact details in the event of problems.
7.STATEMENT OF POSITIVE ENGAGEMENT: In dealing with this application Great Yarmouth Borough Council has actively sought to work with the applicant in a positive and proactive manner, in accordance with paragraphs 186 and 187 of the NPPF.