Great Yarmouth Borough Council Portal
No.Condition Text
1.The development must be begun not later than three years beginning with the date of this permission. The reason for the condition is :- The time limit condition is imposed in order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.
2.The development shall be carried out in accordance with drawing no. 121001/01 received by the Local Planning Authority on 11th July 2013. The reason for the condition is :- For the avoidance of doubt.
3.Prior to the commencement of the use of the egress hereby permitted, a visibility splay measuring 2.4 x 43 metres shall be provided to each side of the access where it meets the highway and such splays shall thereafter be maintained free from any obstruction exceeding 0.6 metres above the level of the adjacent highway carriageway. The reason for the condition is :- In the interests of highway safety.
4.Notwithstanding the details indicated on the submitted drawing no works shall commence on site until a detailed scheme for the off-site highway improvement works, as indicated on drawing no. 121001/01, have been submitted to and approved in writing by the Local Planning Authority in consultation with the Highway Authority. The reason for the condition is :- To ensure that the highway improvement works are designed to an appropriate standard in the interest of highway safety and to protect the environment of the local highway corridor.
5.Prior to the commencement of the use of the egress hereby permitted, the off-site highway improvement works referred to in condition 4 of this permission shall be completed to the written satisfaction of the Local Planning Authority in consultation with the Highway Authority. The reason for the condition is :- To ensure that the highway network is adequate to cater for the development proposed.
6.Prior to the commencement of the use of the egress hereby permitted, an appropriate automatic vehicle barrier shall be provided at the egress onto Pasteur Road. The barrier shall be of a type operated by token or ticket endorsement system, details of the design and location of the barrier shall be submitted to and approved by the Local Planning Authority in consultation with the Highway Authority. The reason for the condition is :- In the interests of highway safety and traffic movement.
7.REASON FOR APPROVAL OF THE APPLICATION :- The proposal meets the criteria of Policy TCM13 of the Great Yarmouth Borough-Wide Local Plan.
8.STATEMENT OF POSITIVE ENGAGEMENT: In dealing with this application Great Yarmouth Borough Council has actively sought to work with the applicant in a positive and proactive manner, in accordance with paragraphs 186 and 187 of the NPPF.
9.NOTES - Please read the following notes carefully:-
10.It is an OFFENCE to carry out any works within the Public Highway, which includes a Public Right of Way, without the permission of the Highway Authority. This development involves work to the public highway that can only be undertaken within the scope of a legal Agreement between the applicant and the County Council. Please note that it is the applicant's responsibility to ensure that, in addition to planning permission, any necessary Agreements under the Highways Act 1980 are also obtained. Advice on this matter can be obtained from the County Council's Highways Development Management Group based at County Hall in Norwich. Please contact Stuart French on 0344 800 8020. Public Utility apparatus may be affected by this proposal. Contact the appropriate utility service to reach agreement on any necessary alterations, which will have to be carried out at the expense of the developer. If required, street furniture will need to be repositioned at the applicant's expense.