| No. | Condition Text |
|---|
| 1. | This permission expires on 30th June 2014 and unless on, or before, this date application has been made for an extension to the period of permission and such application is approved by the Local Planning Authority, the buildings, concrete pads and any other structures associated with the use hereby permitted shall be removed from the site.
The reason for the condition is :-
In order to retain control over the development and associated buildings and in the interests of the visual amenities of the area. |
| 2. | All structures and modular components shall be securely anchored in order to prevent them becoming buouyant in a flood event.
The reason for the condition is :-
To reduce the flood hazard to people and property. |
| 3. | Prior to commencement of the use hereby permitted any access gate(s), bollard, chain or other means of obstruction shall be hung to open inwards and set back a minimum distance of 5 metres from the near channel edge of the adjacent carriageway. Any sidewalls / fences / hedges adjacent to the access shall be splayed at an angle of 45 degrees from each of the (outside) gateposts to the front boundary of the site.
The reason for the condition is:
To enable vehicles to safely draw off the highway before the gate(s) or obstruction is opened.
|
| 4. | Prior to the commencement of the use hereby permitted a visibility splay shall be provided in full accordance with the details indicated on the approved plan. The splay shall thereafter be maintained free from any obstruction exceeding 0.6 metres above the level of the adjacent highway carriageway.
The reason for the condition is:
In the interests of highway safety.
|
| 5. | Prior to the commencement of the use hereby permitted the proposed access, on-site car and cycle parking, servicing, loading, unloading, and turning / waiting area shall be laid out, demarcated, levelled, surfaced and drained in accordance with the approved plan and retained thereafter available for that specific use.
The reason for the condition is:
To ensure the permanent availability of the parking manoeuvring area, in the interests of highway safety.
|
| 6. | REASON FOR APPROVAL OF THE APPLICATION :-
The proposal meets the criteria of policy EMP16 of the adopted Great Yarmouth Borough Wide Local Plan. |
| 7. | NOTES - Please read the following notes carefully:-
Only clean, uncontaminated surface water should be discharged to any watercourse or surface water sewer.
All cleaning and washing operations should therefore be carried out in designated areas isolated from the surface water system and draining to the foul sewer (with the approval of the sewerage undertaker). The area should be clearly marked and a kerb surround in recommended.
*There is an existing water main crossing the site that may require diverting. The full cost of works will be charged for the execution of thie works by Essex & Suffolk Water.* |