1.The development must be begun not later than three years beginning with the date of this permission. The reason for the condition is :- The time limit condition is imposed in order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.
2.The development shall be carried out in accordance with the revised plan received by the Local Planning Authority on 6th November 2012. The reason for the condition is :- For the avoidance of doubt.
3.No development shall be carried out outside the follwoing hours: 08:00 to 18:00 hours Monday to Friday 08:30 to 13:30 hours Saturdays No work on Sundays or Bank Holidays The reason for the condition is :- To ensure the amenities of nearby residents are not disturbed to any significant or detrimental degree.
4.REASON FOR APPROVAL OF THE APPLICATION :- The proposals meet the criteria for new housing development set out in Policies HOU7 and HOU15 of the adopted Great Yarmouth Borough-wide Local Plan
5.NOTES - Please read the following notes carefully:- FIRE SAFETY: The internal structure of the proposed development should ensure that 60 minutes imperforate separation is achieved between the ground floor commercial and first floor residential uses of the property. There should be a mains-powered fire detection system linking the proposed residential accommodation with the communal areas and the ground floor/basement level commercial accommodation. NOISE: The internal structure of the building must provide adequate noise attenuation between the units of residential accommodation and any communal areas and from external noise. The levels of insulation should be in accordance with the current Building Regulations. ROOM SIZES: The internal dimensions of all rooms within the proposed self-contained flats shall comply with the minimum requirements of the Council¿s standards for this type of property and expected occupancy of each dwelling. A copy of these standards is available from Environmental Health. VENTILATION: Adequate mechanical ventilation must be provided to all bathrooms and kitchen areas. Mechanical ventilation must have a ¿whisper-quiet¿ operation and meet or exceed current Building Regulations. LOCAL AIR QUALITY: The site will potentially generate a significant amount of dust during the construction process; therefore, the following measures should be employed:- - An adequate supply of water shall be available for suppressing dust; - Mechanical cutting equipment with integral dust suppression should be used; - There should be no burning of any materials on site. ADVISORY NOTE: The applicant is strongly recommended to advise neighbouring businesses and residential occupiers of the proposals, together with contact details in the event of problems.