| No. | Condition Text |
|---|---|
| 1. | The development must be begun not later than three years beginning with the date of this permission. The reason for the condition is :- The time limit condition is imposed in order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
| 2. | Prior to the commencement of the use hereby permitted any access gates or other means of obstruction shall be hung to open inwards, set back and thereafter retained at a minimum distance of 5 metres from the near channel edge of the adjacent carriageway. Any fences adjacent to the access shall be splayed at an angle of 45 degrees from each of the (outside) gateposts to the front boundary of the site. The reason for the condition is :- To enable vehicles to safely draw off the highway before the gates or obstruction are opened. |
| 3. | No external lighting shall be installed other than in accordance with the lighting plan as illustrated and described on the submitted plans. The lighting shall thereafter be retained such that it will not cause glare beyond the site boundaries. The reason for the condition is :- In the interests of highway safety. |
| 4. | REASON FOR APPROVAL OF THE APPLICATION :- The proposal is acceptable on this site which is zoned for employment use within the Great Yarmouth Borough-Wide Local Plan. |