Great Yarmouth Borough Council Portal
No.Condition Text
1.The development must be begun not later than three years beginning with the date of this permission. The reason for the condition is :- The time limit condition is imposed in order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.
2.The development hereby permitted shall be carried out in accordance with the application form, the Design and Access Statement and plans (Drawing Nos. 2194/39, 2194/40 Rev A and 2194/41) received by the Local Planning Authority on 10th October 2011. The reason for the condition is :- For the avoidance of doubt and to ensure the satisfactory development of the site in accordance with the approved plans.
3.Prior to the first occupation of the development hereby permitted a 2.0 metre wide parallel visibility splay (as measured back from the near edge of the adjacent highway carriageway) shall be provided across the whole of the site's roadside frontage. The parallel visibility splay shall thereafter be maintained free from any obstruction exceeding 0.6 metres above the level of the adjacent highway carriageway. The reason for the condition is :- In the interests of highway safety.
4.Prior to the first occupation of the development hereby permitted the proposed access and on-site car parking and turning area shall be laid out, demarcated, levelled, surfaced and drained in accordance with the approved plan and retained thereafter available for that specific use. The reason for the condition is :- To ensure the permanent availability of the parking manoeuvring area, in the interests of highway safety.
5.The existing mature hedge on the western boundary of the site shall be retained and shall not be lopped or trimmed below 3.5 metres in height without the prior consent in writing of the Local Planning Authority. The reason for the condition is :- To protect the privacy and amenities of the occupiers of adjoining properties.
6.Prior to commencement of the development hereby permitted an acoustic survey containing details of the sound power levels at given distances from the air source heat pump and the distances from the air source heat pump to the facades of residential properties in the vicinity shall be submitted and approved in writing by the Local Planning Authority in agreement with the Environmental Health Manager. The installation of the air source heat pump shall be carried out in accordance with such details and thereafter maintained to the approved specifications. The reason for the condition is :- In the interests of the residential amenities of adjoining properties.
7.REASON FOR APPROVAL OF THE APPLICATION :- The proposal meets the criteria for new residential development in Policies HOU7 and HOU15 of the adopted Great Yarmouth Borough-Wide Local Plan.