| No. | Condition Text |
|---|
| 1. | The development must be begun not later than three years beginning with the date of this permission.
The reason for the condition is :-
The time limit condition is imposed in order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
| 2. | No development shall take place until the materials to be used for the surfacing of the parking area hereby approved have been submitted to and approved in writing by the local planning authority.
The reason for the condition is :-
To ensure the satisfactory appearance of the development. |
| 3. | The facing materials to be used on the Southern elevation shall match those used on the external surfaces of the existing building.
The reason for the condition is :-
For the avoidance of doubt and to ensure the satisfactory appearance of the development. |
| 4. | No development shall take place until details for the surface water drainage of the car parking area hereby permitted has been submitted to and approved in writing by the local planning authority and shall include such measures to prevent the discharge of surface water onto the adjoining highway.
The reason for the condition is :-
To ensure the satisfactory drainage of the site and to ensure that any surface water run-off is contained within the site. |
| 5. | No development shall take place until full details, including maximum luminosity levels and positioning, of any new security lighting has been submitted to and approved in writing by the local planning authority.
The reason for the condition is :-
In the interests of highway safety. |
| 6. | Prior to the the commencement of the use hereby permitted, the boundary treatment shown on drawing numberDWG DES 100 shall be completed in accordance with the submitted details and all vehicular shall be via Garrision Road and the boundary treatments and access shall thereafter be maintained in accordance with these details.
The reason for the condition is :-
For the avoidance of doubt and to ensure highway safety. |
| 7. | No demolition or construction works shall take place outside the following hours:
Monday to Friday 07:30 to 17:00
Saturday 08:00 to 13:00
No works shall take place on Sundays or Bank Holidays
The reason for the condition is :-
To ensure the amenities of adjacent residents are maintained |
| 8. | REASON FOR APPROVAL OF THE APPLICATION :-
The proposal meets the criteria of policy EMP18 of the adopted Great Yarmouth Borough Wide Local Plan. |
| 9. | NOTES - Please read the following notes carefully:-
The submitted flood evacuation plan should be regularly updated and all staff trained in flood response measures. Further advice can be sought from either the Environment Agency or the Council's Emergency Planning Officer and it is recommended that the applicants also sign up to the Early Warning System available on the Environment Agency website.
This permission does not purport to convey consent under the Advertisement Regulations for any additional signage for which separate consent is required. |