Great Yarmouth Borough Council Portal
No.Condition Text
1.The development must be begun not later than three years beginning with the date of this permission. The reason for the condition is :- The time limit condition is imposed in order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.
2.The development hereby permitted shall be carried out in accordance with the application form, the Design and Access Statement and plans (Drawing Nos. 2270.07 and 2270.08) received by the Local Planning Authority on 1st August 2011 and with the revised plan (Drawing No. 2270.06) received by the Local Planning Authority on 15th August 2011. The reason for the condition is :- For the avoidance of doubt and to ensure the satisfactory development of the site in accordance with the approved plans.
3.Notwithstanding the details submitted in the application form and approved plan (Drawing No. 2270.08) no work shall commence until precise details of the facing bricks and roof tiles to be used in the external surfaces of the development have been submitted to and approved in writing by the Local Planning Authority. The reason for the condition is :- In the interests of the visual amenities of the area as conflicting details have been submitted with the application.
4.Prior to the first occupation of the development hereby permitted the vehicular access shall be laid out in the position shown on the approved plan. Additionally from the property boundary to the near channel edge of the carriageway the construction specification shall be in accordance with details to be approved in writing by the Local Planning Authority in consultation with the Highway Authority. Arrangement shall be made for surface water drainage to be intercepted and disposed of separately so that it does not discharge from or onto the highway carriageway. The reason for the condition is :- To ensure satisfactory access into the site and avoid carriage of extraneous material or surface water from or onto the highway.
5.Notwithstanding the provision of Class A of Schedule 2, Part 2 of the Town and Country Planning (General Permitted Development) Order 1995, (or any Order revoking, amending or re-enacting that Order) no gates, bollard, chain or other means of obstruction shall be erected across the approved access unless details have first been submitted to and approved in writing by the Local Planning Authority. The reason for the condition is :- In the interests of highway safety.
6.Prior to the first occupation of the development hereby permitted a visibility splay shall be provided in full accordance with the details indicated on the approved plan. The splay shall thereafter be maintained free from any obstruction exceeding 0.6 metres above the level of the adjacent highway carriageway. The reason for the condition is :- In the interests of highway safety.
7.Prior to the first occupation of the development hereby permitted sufficient space shall be provided within the site to enable three standard size family cars to park, turn and re-enter the highway in a forward gear. This area shall be levelled, surfaced and drained in accordance with a detailed scheme submitted to and approved in writing by the Local Planning Authority, in consultation with the Highway Authority, and thereafter kept available for that specific use. The reason for the condition is :- In the interests of satisfactory development and highway safety.
8.Prior to the commencement of the development hereby permitted the car parking area indicated in blue on the submitted plan (Drawing No. 2270.06) shall be demarcated, levelled, surfaced and drained, in accordance with a detailed scheme to be submitted to and approved in writing by the Local Planning Authority. This area shall be accessed from the adjoining restaurant car park only and thereafter kept available for that use. The reason for the condition is :- In the interests of satisfactory development and highway safety.
9.Prior to the commencement of the development hereby permitted details of the location, height, design and materials of all new boundary treatment shall be submitted to and approved in writing by the Local Planning Authority. The boundary treatment shall then be erected and retained in full accordance with the approved details in perpetuity. The reason for the condition is :- In the interests of the visual appearance of the area and highway safety, as sufficient detail has not been submitted as part of the application.
10.Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 1995 (or any order revoking and re-enacting the order) no extensions shall be built or additional windows inserted into the walls or roof of the dwelling hereby permitted. The reason for the condition is:- In the interests of the residential amenities of the occupiers of the adjacent property.
11.REASON FOR APPROVAL OF THE APPLICATION :- The proposal meets the criteria for new dwellings set out in Policies HOU8 and HOU15 of the adopted Great Yarmouth Borough-wide Local Plan.
12.NOTES - Please read the following notes carefully:- Highways Information This development involves works within the public highway that can only be carried out by Norfolk County Council as Highway Authority unless otherwise agreed in writing. It is an OFFENCE to carry out any works within the Public Highway, which includes a Public Right of Way, without the permission of the Highway Authority. Please note that it is the applicants' responsibility to ensure that, in addition to planning permission, any necessary consents or approvals under the Highways Act 1980 and the New Roads and Street Works Act 1991 are also obtained from the County Council. Advice on this matter can be obtained from the County Council's Highway Development Control Group. Please contact Paul Leared on 01493 846393 or paul.leared@norfolk.gov.uk. If required, street furniture will need to be repositioned at the applicants own expense. Public Utility apparatus may be affected by this proposal. Contact the appropriate utility service to reach agreement on any necessary alterations, which have to be carried out at the expense of the developer.