1.The development must be begun not later than three years beginning with the date of this permission. The reason for the condition is :- The time limit condition is imposed in order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.
2.The development hereby permitted shall be carried out entirely in accordance with the details shown on the application forms, design and access statement and plans 6777, PO5, 6777 PO6, and 6777 PO8 received by the Local Planning Authority on 28th July 2011 and drawings 6667 PO3 revA, 6777-SK07 and 6777 PO4 revA received by the Local Planning Authority on 27th September 2011. The reason for the condition is :- For the avoidance of doubt
3.Prior to the first occupation of the development hereby permitted (or Prior to the commencement of the first use hereby permitted) the vehicular access shall be laid out in the position shown on the approved plan. Additionally from the property boundary to the near channel edge of the carriageway the construction specification shall be in accordance with details to be approved in writing by the Local Planning Authority in consultation with the Highway Authority. Arrangement shall be made for surface water drainage to be intercepted and disposed of separately so that it does not discharge from or onto the highway carriageway. The reason for the condition is:- To ensure satisfactory access into the site and avoid carriage of extraneous material or surface water from or onto the highway.
4.Concurrent with the new access to Ormesby Road being brought into use the existing accesses to the complex shall be permanently closed, and the footway shall be reinstated in accordance with a detailed scheme to be agreed with the Local Planning Authority in consultation with the Highway Authority. The reason for condition is:- In the interests of highway safety.
5.The development of the first phase of development shall be carried out in accordance with the details shown on drawing 6667-SK07 and subsequent details of phasing shall be submitted for the approval of the Local Planning Authority and works carried out entirely in accordance with such details as may be agreed. The reason for the condition is :- In order to ensure that the development proceeds in an orderly manner.
6.Before the development is commenced a scheme of planting and landscaping shall be submitted for the approval of the Local Planning Authority and the planting of trees and shrubs shall be carried out in accordance with the scheme as approved within 9 months of the approval. Any trees and shrubs so planted which dies within 5 years shall be replaced within one year by the applicants or their sucessors in title. The reason for the condition is:- To enhance the visual amenities of the locality
7.Demolition works or construction works on the site shall not take place outside the following times:- 07.30 to 18.00 Monday to Friday 08.00 to 13.00 Saturday with no demolition works taking place on on Sundays and Bank Holidays and no construction works taking place producing audible noise at the noise sensitive property. The reason for the condition is :- In the interests of the residential amenities of the occupiers of the nearby property.
8.No work shall commence on the main complex building until the exact type and colour of the external materials have been submitted to and approved by the Local Planning Authority. The reason for the condition is :- In the interests of the visual amenities of the area as precise details of the materials have not been submitted.
9.REASON FOR APPROVAL OF THE APPLICATION :- The proposal meets the requirements of Policy TR1 and TR11 of the Great Yarmouth Borough-Wide Local Plan with regard to the provision of improved tourism related facilities.
10.The existing trees shown on the revised plans to be retained on the site shall not be felled or damaged in any way without the prior consent in writing of the Local Planning Authority. The reason for the condition is:- The existing trees represent an important visual amenity which the Local Planning Authority consider should be substantially maintained.
11.Prior to any work commencing on the security hut and mounding works adjacent to the entrance of the site, precise details of these works shall be submitted for the approval of the Local Planning Authority and all works shall be completed in accordance with such details as may be agreed. The reason for the condition is :- Precise detils have not been submitted as a part of the application.
12.NOTES - Please read the following notes carefully:- This development involves works within the public highway that can only be carried out by Norfolk County Council as Highway Authority unless otherwise agreed in writing. It is an OFFENCE to carry out any works within the Public Highway, which includes a Public Right of Way, without the permission of the Highway Authority. Please note that it is the applicants' responsibility to ensure that, in addition to planning permission, any necessary consents or approvals under the Highways Act 1980 and the New Roads and Street Works Act 1991 are also obtained from the County Council. Advice on this matter can be obtained from the County Council's Highway Development Control Group . Please contact (insert appropriate contact details). If required, street furniture will need to be repositioned at the applicants own expense. Public Utility apparatus may be affected by this proposal. Contact the appropriate utility service to reach agreement on any necessary alterations, which have to be carried out at the expense of the developer.
13.The applicants attention is drawn to the following comments from Environment Health and the need to fully comply with these requirements:- a) Asbetos Removal - If asbestos is present on site it must be removed by a licensed contractor to ensure all works are carried out safely and if necessary a risk assessment is in place. b) After demolition all materials must be disposed of appropriately and safely in accordance with current legislation. c) The developemnt has the potential to cause nuisance to local residents living nearby from both construction and demolitio at the site. This must be taken into account and the impact of noise from the operation and measures should be taken to ensure that undue noise disturbance is not present at the facades of residential accommodation. d) Effort must be made to reduce the impact of dust generation to local residential propertiesand commercial uses in the vicinity of the development. Where possible a supply of water, protected against frost, should be provided to address the problem.