Great Yarmouth Borough Council Portal
No.Condition Text
1.The development must be begun not later than three years beginning with the date of this permission. The reason for the condition is :- The time limit condition is imposed in order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.
2.Prior to the commencement of development a detailed, scaled plan of the entire site to show the access with visibility splay, driveway, car parking and turning area and the area for the standing of horsebox and tractor, shall be submitted to and approved in writing by the Local Planning Authority. The reason for the condition is :- Insufficient details have been supplied with the application.
3.Prior to commencement of the development hereby permitted details of the design, materials and construction of the entrance pillars, gates and lantern lights shall be submitted to and approved in writing by the Local Planning Authority. The reason for the condition is :- In the interests of the satisfactory visual appearance of the development as such details were not submitted with the application.
4.No part of the proposed structure shall overhang or encroach upon highway land and no gate, if installed, shall open outwards over the highway. The reason for the condition is :- In the interests of highway safety.
5.Prior to the commencement of the use hereby permitted the vehicular access shall be laid out in the position shown on the approved plan. Additionally from the property boundary to the near channel edge of the carriageway the construction specification shall be in accordance with details to be approved in writing by the Local Planning Authority in consultation with the Highway Authority. Arrangement shall be made for surface water drainage to be intercepted and disposed of separately so that it does not discharge from or onto the highway carriageway. The reason for the condition is :- To ensure satisfactory access into the site and avoid carriage of extraneous material or surface water from or onto the highway.
6.Prior to the commencement of the use hereby permitted the proposed on-site driveway and car parking area shall be laid out, demarcated, levelled, surfaced and drained in accordance with the approved plan and retained thereafter available for that specific use. The reason for the condition is :- To ensure the permanent availability of the parking manoeuvring area, in the interests of highway safety.
7.Vehicular and pedestrian access to and egress from the adjoining highway shall be limited to the access shown on the submitted drawing only. Any other access or egresses shall be permanently closed, and the footway / highway verge shall be reinstated in accordance with a detailed scheme to be agreed with the Local Planning Authority in consultation with the Highway Authority, concurrently with the bringing into use of the new access. The reason for the condition is :- In the interests of highway safety.
8.Prior to commencement of the use hereby permitted any access gates, bollard, chain or other means of obstruction, if installed, shall be hung to open inwards and set back a minimum distance of 5 metres from the near channel edge of the adjacent carriageway. Any sidewalls / fences / hedges adjacent to the access shall be splayed at an angle of 45 degrees from each of the (outside) gateposts to the front boundary of the site. The reason for the condition is :- To enable vehicles to safely draw off the highway before the gate(s) or obstruction is opened.
9.Prior to the commencement of the use hereby permitted a 2.4 metre wide parallel visibility splay as measured back from the near edge of the adjacent highway carriageway shall be provided across the site's roadside frontage adjacent to the new access. The parallel visibility splay shall thereafter be maintained free from any obstruction exceeding 0.6 metres above ground level. The reason for the condition is :- In the interests of highway safety.
10.No development shall take place until there has been submitted to and approved by the Local Planning Authority a scheme of landscaping, which shall include indications of all existing trees and hedgerows on the land, and details of any to be retained, together with measures for their protection in the course of development. The reason for the condition is:- In the interests of the visual amenities of the locality.
11.The existing trees on the site shall not be felled or damaged in any way without the prior consent in writing of the Local Planning Authority. The reason for the condition is:- The existing trees represent an important visual amenity which the Local Planning Authority consider should be substantially maintained.
12.Prior to the commencement of the development hereby permitted details of the location, height, design and materials of all boundary fences shall be submitted to and approved in writing by the Local Planning Authority. The fences shall then be erected and retained in full accordance with the approved details in perpetuity. The reason for the condition is :- In order for the Local Planning Authority to retain control over this aspect of the development in the interests of the visual amenities of the locality.
13.Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 1995 (or any order revoking and re-enacting the order) no garden shed, greenhouse, summerhouse, garage or similar domestic outbuilding shall be erected within the area of land subject to this planning permission without the prior consent of the Local Planning Authority. The reason for the condition is:- In the interests of the residential amenities of the occupiers of the adjacent property.
14.REASON FOR APPROVAL OF THE APPLICATION :- The proposal meets the criteria of Policies NNV2, NNV5 and TCM13 of the adopted Great Yarmouth Borough-Wide Local Plan.
15.This development involves works within the public highway that can only be carried out by Norfolk County Council as Highway Authority unless otherwise agreed in writing. It is an OFFENCE to carry out any works within the Public Highway, which includes a Public Right of Way, without the permission of the Highway Authority. Please note that it is the applicants' responsibility to ensure that, in addition to planning permission, any necessary consents or approvals under the Highways Act 1980 and the New Roads and Street Works Act 1991 are also obtained from the County Council. Advice on this matter can be obtained from the County Council's Highway Development Control Group . Please contact Paul Leared on 0344 800 800 9. If required, street furniture will need to be repositioned at the applicants own expense. Public Utility apparatus may be affected by this proposal. Contact the appropriate utility service to reach agreement on any necessary alterations, which have to be carried out at the expense of the developer.