| No. | Condition Text |
|---|
| 1. | The development must be begun not later than three years beginning with the date of this permission.
The reason for the condition is :-
The time limit condition is imposed in order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
| 2. | The development hereby permitted shall be carried out in accordance with the application form and plans (Project No. 8121C104019 Drawing Nos. 01, 02, 03, 04 & 05) received by the Local Planning Authority on 13th April 2011.
The reason for the condition is :-
For the avoidance of doubt and to ensure the satisfactory development of the site in accordance with the approved plans. |
| 3. | No development shall take place until there has been submitted to and approved by the Local Planning Authority a scheme of landscaping, which shall include indications of all existing trees and hedgerows on the land, and details of any to be retained, together with measures for their protection in the course of development.
The reason for the condition is:-
In the interests of the visual amenities of the locality. |
| 4. | The existing hedgerow on the eastern boundary of the site (shown on Drawing No. 03) is to be retained at a minimum height of 2 metres in perpetuity and shall be protected during the construction period.
The reason for the condition is :-
In the interests of the visual amenities of the site and for the retention of wildlife habitat. |
| 5. | Prior to the first occupation of the development hereby approved the proposed on-site car parking area shall be laid out, demarcated, levelled, surfaced and drained in accordance with the approved plan and retained thereafter available for that specific use.
The reason for the condition is :-
To ensure the permanent availability of the parking manoeuvring area, in the interests of highway safety. |
| 6. | Prior to the first occupation of the development hereby approved the vehicular access shall be laid out in the position shown on the approved plan. Additionally from the property boundary to the near channel edge of the carriageway the construction specification shall be in accordance with details to be approved in writing by the Local Planning Authority in consultation with the Highway Authority. Prior to the works commencement arrangement shall be made for surface water drainage to be intercepted and disposed of separately so that it does not discharge from or onto the highway carriageway.
The reason for the condition is:-
To ensure satisfactory access into the site and avoid carriage of extraneous material or surface water from or onto the highway. |
| 7. | Notwithstanding the provision of Class A of Schedule 2, Part 2 of the Town and Country Planning (General Permitted Development) Order 1995, (or any Order revoking, amending or re-enacting that Order) no gates, bollard, chain or other means of obstruction shall be erected across the approved access unless details have first been submitted to and approved in writing by the Local Planning Authority.
The reason for the condition is:-
In the interests of highway safety. |
| 8. | No part of the proposed structure (to include fascia board / rainwater goods and guttering) shall overhang or encroach upon highway land, to include the adjacent unmade public footway, and no gate / door / ground floor window if installed shall open outwards over the highway.
The reason for the condition is :-
In the interests of highway safety. |
| 9. | Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 1995 (or any order revoking and re-enacting the order) no extensions shall be built or windows inserted into the roof of the buildings without the prior consent of the Local Planning Authority.
The reason for the condition is:-
In the interests of the residential amenities of the occupiers of the adjacent properties. |
| 10. | REASON FOR APPROVAL OF THE APPLICATION :-
The proposal meets the criteria of Policies HOU8 and HOU15 of the adopted Great Yarmouth Borough-Wide Local Plan. |
| 11. | NOTES - Please read the following notes carefully:-
This development involves works within the public highway that can only be carried out by Norfolk County Council as Highways Authority unless otherwise agreed in writing.
It is an OFFENCE to carry out any works within the Public Highway, which includes a Public Right of Way, without the permission of the Highway Authority. Please note that it is the applicants' responsibility to ensure that, in addition to planning permission, any necessary consents or approvals under the Highways Act 1980 and the New Roads and Street Works Act 1991 are also obtained from the County Council's Highways Development Control Group. Please contact Mr Paul Leared on 0344 800 800 9.
If required, street furniture will need to be repositioned at the applicants own expense.
Public Utility apparatus may be affected by this proposal. Contact the appropriate utility service to reach agreement on any necessary alterations, which have to be carried out at the expense of the developer.
|