Great Yarmouth Borough Council Portal
No.Condition Text
1.The development must be begun not later than three years beginning with the date of this permission. The reason for the condition is :- The time limit condition is imposed in order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.
2.The development hereby permitted shall be carried out entirely in accordance with the details shown on the Design and Access Statement, application forms and plans received by the Local Planning Authority on 14th July 2011. The reason for the condition is :- For the avoidance of doubt.
3.Prior to the commencement of the extension hereby permitted space shall be provided within the site to enable 4 additional standard size family cars to park, turn and re-enter the highway in a forward gear, toether with 4 cycle parking spaces. This area shall be levelled, surfaced and drained in accordance with a detailed scheme submitted to and approved in writing by the Local Planning Authority, in consultation with the Highway Authority, and thereafter available for that specific use. The reason for the condition is:- In the interests of satisfactory development and highway safety.
4.Only clean uncontaminated surface water from the roofs or structures can be discharged to the local dyke network. all other surface and waste water shall be discharged into the foul sewer. The reason for the condition is :- To prevent contamination of nearby dykes.
5.The materials to be used in the construction of the external surfaces of the development hereby permitted shall match those used in the existing building unless otherwise agreed in writing with the local planning authority. The reason for the condition is :- To ensure the satisfactory appearance of the development.
6.Floor levels within the proposed development will be set no lower than existing levels AND flood proofing of the the development hereby approved has been incorporated where appropriate. The reason for the condition is :- To protect the building and its users from flooding.
7.REASON FOR APPROVAL OF THE APPLICATION :- The proposal meets the requirements of Policy EMP8 of the adopted Great Yarmouth Borough-wide Local Plan.