| No. | Condition Text |
|---|
| 1. | The development must be begun not later than three years beginning with the date of this permission.
The reason for the condition is :-
The time limit condition is imposed in order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
| 2. | Prior to the first occupation of any of the units hereby approved the vehicular access shall be constructed in accordance with Norfolk County Council's industrial access construction specification, and additionally to accord with details to be approved in writing by the Local Planning Authority, for the first 5 metres into the site as measured back from the near edge of the adjacent carriageway.
The reason for the condition is :-
In the interests of highway safety. |
| 3. | The access shall be constructed with adequate drainage measures to prevent surface water run-off onto the adjacent public highway, in accordance with a detailed scheme submitted to and approved in writing by the Local Planning Authority, in consultation with the Highway Authority.
The reason for the condition is :-
To prevent extraneous material being deposited on the highway. |
| 4. | Prior to the first occupation of any of the units hereby approved the proposed access/on-site car and cycle parking/servicing/loading, unloading/turning/waiting area shall be laid out, demarcated, levelled, surfaced and drained in accordance with details to be submitted to and approved by the Local Planning Authority and retained thereafter available for that specific use.
The reason for the condition is :-
To ensure the provision of adequate on-site parking and turning facilities for the development. |
| 5. | Prior to the commencement of the development hereby approved the following components of a scheme to deal with the risks associated with contamination of the site shall each be submitted to and approved, in writing, by the Local Planning Authority:
1) A preliminary risk assessment which has identified:
a) all previous uses
b) potential contaminants associated with those uses
c) a conceptual model of the site indicating sources, pathways and receptors
d) potentially unacceptable risks arising from contamination at the site.
2) A site investigation scheme, based on (1) to provide information for a detailed assessment of the risk to all receptors that may be affected, including those off site.
3) The site investigation results and the detailed risk assessment (2) and, based on these, an options appraisal and remediation strategy giving full details of the remediation measures required and how they are to be undertaken.
4) A verification plan providing details of the data that will be collected in order to demonstrate that the works set out in (3) are complete and identifying any requirements for longer-term monitoring of pollutant linkages, maintenance and arrangements for contingency action.
Any changes to these components require the express consent of the Local Planning Authority. The scheme shall be implemented as approved.
The reason for the condition is :-
To ensure that the proposed development does not cause pollution of Controlled Waters and that development complies with approved details in the interests of protection of Controlled Waters. |
| 6. | Prior to the first occupation of any part of the development hereby permitted, a verification report demonstrating completion of the works set out in the approved remediation strategy and the effectiveness of the remediation shall be submitted to and approved, in writing, by the Local Planning Authority. The report shall include results of sampling and monitoring carried out in accordance with the approved verification plan to demonstrate that the site remediation criteria have been met. It shall also include any plan (a long-term monitoring and maintenance plan) for longer-term monitoring of pollutant linkages, maintenance and arrangements for contingency action, as identified in the verification plan, and for the reporting of this to the Local Planning Authority.
The reason for the condition is :-
To ensure that the proposed development does not cause pollution of Controlled Waters and that development complies with approved details in the interests of protection of Controlled Waters. |
| 7. | Reports on monitoring, maintenance and any contingency action carried out in accordance with a long-term monitoring and maintenance plan shall be submitted to the Local Planning Authority as set out in that plan. On completion of the monitoring programme a final report demonstrating that all long term site remediation criteria have been met and documenting the decision to cease monitoring shall be submitted to and approved in writing by the Local Planning Authority.
The reason for the condition is :-
To ensure that the proposed development does not cause pollution of Controlled Waters and that development complies with approved details in the interests of protection of Controlled Waters. |
| 8. | If, during development, contamination not previously identified is found to be present at the site then no further development (unless otherwise agreed in writing with the Local Planning Authority) shall be carried out until the developer has submitted and obtained written approval from the Local Planning Authority for an amendment to the remediation strategy detailing how this unsuspected contamination shall be dealt with.
The reason for the condition is :-
To ensure that the proposed development does not cause pollution of Controlled Waters and that development complies with approved details in the interests of protection of Controlled Waters. |
| 9. | No development shall take place until a Flood Response Plan, incorporating the amendments suggested by the Council's Emergency Planning Manager, has been submitted to and approved by the Local Planning Authority.
The reason for the condition is :-
In the interests of the safety of the future occupiers of the units. |
| 10. | If piling is to be used, the quietest appropriate method shall be employed.
Piling shall not take place outside the following hours:-
09:00 to 17:00 Monday to Friday
09:00 to 13:00 Saturday
and no piling shall take place on Sundays or Bank Holidays.
The reason for the condition is :-
In the interests of the amenities of the occupiers of nearby buildings. |
| 11. | REASON FOR APPROVAL OF THE APPLICATION :-
The proposal meets the requirements of Policy EMP2 in respect of commercial developments, shown as an allocation for employment land in the Great Yarmouth Borough-Wide Local Plan. |
| 12. | NOTES - Please read the following notes carefully:- |
| 13. | The applicant's attention is drawn to the attached letter from Norfolk Constabulary and the advice contained therein. |
| 14. | It is an OFFENCE to carry out any works within the Public Highway, which includes a Public Right of Way, without the permission of the Highway Authority This development involves work to the public highway that can only be undertaken within the scope of a legal Agreement between the applicant and Norfolk County Council. Please note that it is the applicant's responsibility to ensure that, in addition to planning permission, any necessary Agreements under the Highways Act 1980 are also obtained. Advice on this matter can be obtained from the County Council's Highways Development Control Group based at County Hall in Norwich. Please contact Liz Poole at liz.poole@norfolk.gov.uk
Public Utility apparatus may be affected by this proposal. Contact the appropriate utility service to reach agreement on any necessary alterations, which have to be carried out at the expense of the developer. |