| No. | Condition Text |
|---|
| 1. | The development must be begun not later than three years beginning with the date of this permission.
The reason for the condition is :-
The time limit condition is imposed in order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
| 2. | Prior to the commencement of development a full Flood Evacuation Plan shall be submitted to and agreed in writing with the local planning authority.
The reason for the condition is :-
To ensure the safety of occupants of the building in event of flood. |
| 3. | Prior to the commencement of the first use hereby permitted the vehicular access shall be laid out in the position shown on the approved plan. Additionally from the property boundary to the near channel edge of the carriageway the construction specification shall be in accordance with details to be approved in writing by the Local Planning Authority in consultation with the Highway Authority. Arrangement shall be made for surface water drainage to be intercepted and disposed of separately so that it does not discharge from or onto the highway carriageway.
The reason for the condition is:
To ensure satisfactory access into the site and avoid carriage of extraneous material or surface water from or onto the highway.
|
| 4. | No part of the proposed structure (to include fascia board / rainwater goods and guttering) shall overhang or encroach upon highway land and no gate / door / ground floor window if installed shall open outwards over the highway.
The reason for the condition is:
In the interests of highway safety.
|
| 5. | REASON FOR APPROVAL OF THE APPLICATION :-
The proposal meets the provisions of the Great Yarmouth Borough Wide Local Plan and, in particular policies EMP8 and BNV18 as it relates to the reuse of an existing building within a commercial/industrial area. |
| 6. | NOTES - Please read the following notes from Norfolk County Highways carefully:-
This development involves works within the public highway that can only be carried out by Norfolk County Council as Highway Authority unless otherwise agreed in writing.
It is an OFFENCE to carry out any works within the Public Highway, which includes a Public Right of Way, without the permission of the Highway Authority. Please Note that it is the applicants' responsibility to ensure that, in addition to planning permission, any necessary consents or approvals under the Highways Act 1980 and the New Roads and Street Works Act 1991 are also obtained from the County Council. Advice on this matter can be obtained from the County Council's Highway Development Management Group. Please contact Paul Leared on 0344 800 8009.
If required, street furniture will need to be repositioned at the applicants own expense.
Public Utility apparatus may be affected by this proposal. Contact the appropriate utility service to reach agreement on any necessary alteration, which have to be carried out at the expense of the developer.
|