| No. | Condition Text |
|---|
| 1. | The development must be begun not later than three years beginning with the date of this permission.
The reason for the condition is :-
The time limit condition is imposed in order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
| 2. | The development hereby permitted shall be carried out in accordance with the application form, plans and any other details as submitted on 11th October 2010.
The reason for the condition is :-
For the avoidance of doubt. |
| 3. | No develpment shall take place outside the following hours:
Monday to Friday 08:00 - 18:00hrs
Saturday 09:00 - 13:00hrs
No working on Sundays or Bank Holidays
Work connected with the site outside of these hours is permissable provided they are inaudible at the boundary of the nearest noise sensitive dwellings.
If piling is to be used, the quietest appropriate method should be employed. Piling should only be carried out during the following hours:-
Monday to Friday 09:00 - 17:00hrs
Saturday 09:00 - 13:00hrs
No piling on Sundays or Bank Holidays.
The reason for the condition is :-
To ensure that any nearby residential properties are not unduly disturbed during construction. |
| 4. | The development hereby permitted shall be carried out in accordance with the Flood Mitigation Measures submitted on 12th November 2010 and all floor levels within the development will be set no lower than existing levels AND flood proofing of the proposed development has been included where appropriate.
The reason for the condition is :-
To ensure the safety of all users of the faciltiy in times of flood. |
| 5. | REASON FOR APPROVAL OF THE APPLICATION :-
The proposal meets the provisions of the Great Yarmouth Borough Wide Local Plan and, in particular, policies EMP8 and BNV18 as it is for the extension of an existing commercial/industrial property. |
| 6. | NOTES - Please read the following notes from Environmental Health carefully:-
The applicant and contractors working on the site should follow the general principles of BS5228:2009 - Noise Control on Construction Sites.
A supply of water protected from frost shall be provided for use in the control of dust from the construction site. |