No.Condition Text
1.The development must be begun not later than three years beginning with the date of this permission. The reason for the condition is :- The time limit condition is imposed in order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.
2.The development hereby permitted shall be carried out entirely in accordance with the details shown on the application forms, Design and Access Statement and drawing no.607/2 received by the Local Planning Authority on 5th October 2010. The reason for the condition is :- For the avoidance of doubt.
3.Prior to any work commencing on the development hereby permitted details of the boundary treatments to be installed shall be submitted for the approval of the Local Planning Authority and such works in accordance with such details as may be agreed shall be completed prior to the first occupation of the dwelling hereby permitted. The reason for the condition is :- Precise details have not been submitted as a part of the application and in the interests of the visual amenities of the area
4.No work shall commence until the exact type and colour of the materials have been submitted to and approved by the Local Planning Authority. The reason for the condition is :- In the interests of the visual amenities of the area as precise details of the materials have not been submitted.
5.Prior to the first occupation of the development hereby permitted any access gate(s), bollard, chain or other means of obstruction shall be hung to open inwards and set back a minimum distance of 5 metres from the near channel edge of the adjacent carriageway. Any sidewalls / fences / hedges adjacent to the access shall be splayed at an angle of 45 degrees from each of the (outside) gateposts to the front boundary of the site. The reason for the condition is:- To enable vehicles to safely draw off the highway before the gate(s) or obstruction is opened.
6.Prior to the first occupation of the development hereby permitted (or Prior to the commencement of the use hereby permitted) a visibility splay measuring 2.4metres X site extremity shall be provided to each side of the access where it meets the highway and such splays shall thereafter be maintained free from any obstruction exceeding 0.6 metres above the level of the adjacent highway carriageway. The reason for the condition is:- In the interests of highway safety.
7.Prior to the first occupation of the development hereby permitted the proposed access on-site car parking and turning area shall be laid out, demarcated, levelled, surfaced and drained in accordance with the approved plan and retained thereafter available for that specific use. The reason for the condition is:- To ensure the permanent availability of the parking manoeuvring area, in the interests of highway safety.
8.Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 1995 (or any order revoking, re-enacting or modifying that Order), no windows or other openings (other than the window expressly authorised by this permission) shall be constructed above ground floor level of the dwelling hereby permitted. The reason for the condition is :- In the interests of the residential amenities of the occupiers of adjacent property.
9.REASON FOR APPROVAL OF THE APPLICATION :- The proposals meet the criteria for new housing development set out in Policies HOU7 and HOU15 of the adopted Great Yarmouth Borough-wide Local Plan