Great Yarmouth Borough Council Portal
No.Condition Text
1.The development must be begun not later than three years beginning with the date of this permission. The reason for the condition is :- The time limit condition is imposed in order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.
2.No work shall commence until the exact type and colour of the materials have been submitted to and approved by the Local Planning Authority. The reason for the condition is :- In the interests of the visual amenities of the area as precise details of the materials have not been submitted.
3.No part of the proposed structure shall overhang or encroach upon highway land and no gate or door if installed shall open outwards over the highway. The reason for the condition is: In the interests of highway safety.
4.Prior to the garage as amended being first being brought into use the vehicular access shall be laid out in the position shown on the approved plan. Additionally from the property boundary to the near channel edge of the carriageway the construction specification shall be in accordance with details to be approved in writing by the Local Planning Authority in consultation with the Highway Authority. Arrangement shall be made for surface water drainage to be intercepted and disposed of separately so that it does not discharge from or onto the highway carriageway. The reason for the condition is: To ensure satisfactory access into the site and avoid carriage of extraneous material or surface water from or onto the highway.
5.Prior to the commencement of the use hereby permitted any access gate, bollard, chain or other means of obstruction shall be hung to open inwards and set back on the front boundary of the site. The reason for the condition is: To enable vehicles to safely draw off the highway before the gate or obstruction is opened.
6.Prior to the commencement of the use hereby permitted the proposed access and on-site car parking and turning area shall be laid out, demarcated, levelled, surfaced and drained in accordance with the approved plan and retained thereafter available for that specific use. The reason for the condition is :- To ensure the permanent availability of the parking manoeuvring area, in the interests of highway safety.
7.REASON FOR APPROVAL OF THE APPLICATION :- The proposal meets the criteria for domestic additions set out in Policy HOU18 of the adopted Great Yarmouth Borough-wide Local Plan.
8.NOTES - Please read the following notes carefully:- This development involves works within the public highway that can only be carried out by Norfolk County Council as Highway Authority unless otherwise agreed in writing. It is an OFFENCE to carry out any works within the Publich highway, which includes a Public Right of Way, without the permission of the Highway Authority. Please note that it is the applicants' responsibility to ensure that, in addition to planning permission, any necessary consents or approvals under the Highways Act 1980 and the New Roads and Street Works Act 1991 are also obtained from the County Council. Advice on this matter can be obtained from the County Council's Highway Development Control Group.Please contact Paul LEared on 0344 800 800 9 for further advice. If required, street furniture will need to be repositioned at the applicants own expense. Public Utility apparatus may be affected by this proposal. Contact the appropriate utility service to reach agreement on any necessary alterations, which have to be carried out at the expense of the developer.