No.Condition Text
1.The development must be begun not later than three years beginning with the date of this permission. The reason for the condition is :- The time limit condition is imposed in order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.
2.The development shall be carried out in accordance with the revised plan received by the Local Planning Authority on 3rd August 2010. The reason for the condition is :- For the avoidance of doubt.
3.The parking space hereby approved shall not be brought into use until the existing boundary walls have been reduced in height as shown on the approved plan. The reason for the condition is :- In the interests of highway safety.
4.No part of the proposed structure shall overhang or encroach upon highway land and no gate, door or ground floor window, if installed, shall open outwards over the highway. The reason for the condition is :- In the interests of highway safety.
5.The parking space hereby approved shall not be brought into use until the vehicular access has been laid out in the position shown on the approved plan. The construction specification from the property boundary to the near channel edge of the carriageway shall be in accordance with details to be approved in writing by the Local Planning Authority in consultation with the Highway Authority. Arrangement shall be made for surface water drainage to be intercepted and disposed of separately so that it does not discharge from or onto the highway carriageway. The reason for the condition is :- To ensure satisfactory access into the site and avoid carriage of extraneous material or surface water from or onto the highway.
6.Notwithstanding the provision of Class A of Schedule 2, Part 2 of the Town and Country Planning (General Permitted Development) Order 1995, (or any Order revoking, amending or re-enacting that Order) no gates, bollards, chain or other means of obstruction shall be erected across the approved access unless details have first been submitted to and approved in writing by the Local Planning Authority. The reason for the condition is :- In the interests of highway safety.
7.REASON FOR APPROVAL OF THE APPLICATION :- The proposal meets the criteria for domestic additions set out in Policy HOU18 of the adopted Great Yarmouth Borough-wide Local Plan.
8.This development involves works within the public highway that can only be carried out by Norfolk County Council as Highway Authority unless otherwise agreed in writing. It is an OFFENCE to carry out any works within the Public Highway, which includes a Public Right of Way, without the permission of the Highway Authority. Please note that it is the applicant's responsibility to ensure that, in addition to planning permission, any necessary consents or approvals under the Highways Act 1980 and the New Roads and Street Works Act 1991 are also obtained from the County Council. Please contact Paul Leared of the County Council's Highway Development Control Group on 03448 008009 for advice on this matter. If required, street furniture will need to be repositioned at the applicant's expense. Public Utility apparatus may be affected by this proposal. If necessary, contact the appropriate utility service to reach agreement on any alterations which will have to be carried out at the expense of the developer.