| No. | Condition Text |
|---|
| 1. | The development must be begun not later than three years beginning with the date of this permission.
The reason for the condition is :-
The time limit condition is imposed in order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
| 2. | Notwithstanding the details provided in the 'Design and Access Statement (Rev A)', the type and size of air source heat pump to be installed for each dwelling shall be in accordance with the description of the proposed plant in the noise assessment report undertaken by Adrian James Acoustics Limited and dated 21st April 2010.
The reason for the condition is :-
For the avoidance of doubt. |
| 3. | The air source heat pumps hereby permitted shall not be sited otherwise than in accordance with Drawing Nos. 6584/300 and 6500/D22 Rev C.
The reason for the condition is :-
To ensure the siting of the air source heat pumps is consistent with the findings of the report referred to in condition No. 2 of this permission. |
| 4. | REASON FOR APPROVAL OF THE APPLICATION :-
The proposal provides for an energy efficient and environmentally friendly water and space heating facility which, it is considered, would not have a significant impact on the character and appearance of the Winterton Conservation Area. |