Great Yarmouth Borough Council Portal
No.Condition Text
1.The development must be begun not later than three years beginning with the date of this permission. The reason for the condition is :- The time limit condition is imposed in order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.
2.The development shall be carried out in accordance with the revised drawing no. 1020-103 rev A received by the Local Planning Authority on 18th June 2010 and drawing no's. 1020-104, 1020-105 and 1020-106 received on 4th January 2010. The reason for the condition is :- For the avoidance of doubt.
3.No work shall commence until the exact types and colours of the external materials have been submitted to and approved by the Local Planning Authority. The reason for the condition is :- In the interests of the visual amenities of the area as precise details of the materials have not been submitted.
4.The building hereby approved shall not be brought into use until the disabled parking space and drop-off area shown on drawing 1020-103 rev A have been provided and surfaced in accordance with details to be submitted to and agreed by the Local Planning Authority. The parking space and drop-off area shall be retained thereafter available for those specific uses. The reason for the condition is:- To ensure the permanent availability of the parking space and drop-off area.
5.The building hereby approved shall not be brought into use until the vehicular access/egress has been be laid out in the position shown on the approved plan. Additionally from the property boundary to the near channel edge of the carriageway the construction specification shall be in accordance with details to be approved in writing by the Local Planning Authority in consultation with the Highway Authority. Arrangement shall be made for surface water drainage to be intercepted and disposed of separately so that it does not discharge from or onto the highway carriageway. The reason for the condition is:- To ensure satisfactory access into the site and avoid carriage of extraneous material or surface water from or onto the highway.
6.The building shall not be brought into use until suitable permanent warning notices detailing the nature of the flood risk and the flood plan for this site have been displayed on or within the building. The current and any subsequent owners shall be responsible for keeping all signs legible, clear of obstruction and up-to-date if flood risk information changes. The reason for the condition is :- To ensure that the owners and visitors of the site are aware that the land is at risk of flooding.
7.A scheme for the provision and implementation of flood proofing measures shall be submitted to and agreed, in writing, with the Local Planning Authority. The scheme shall be carried out in its entirety before the development is first occupied and constructed and completed in accordance with the approved plans and in line with the Communities and Local Government document 'Improving the Flood Performance of New Buildings - Flood Resilient Construction'. The reason for the condition is :- To minimise the damage to the development in the event of flooding and enable a faster recovery once floodwaters have subsided as is set out in PPS25 paragraph G8.
8.Demolition and construction work shall not take place outside the following hours:- 07:30 to 18:00 Monday to Friday 08:00 to 13:00 Saturday and no work shall take place on Sundays or Bank Holidays. (These hours shall only apply to work generating noise that is audible at the boundary of the nearest noise sensitive property) The reason for the condition is :- In the interests of the residential amenities of the occupiers of nearby dwellings.
9.The existing trees on the site shown as being retained in the Arboricultural Implications Assessment submitted with the application, shall not be felled or damaged in any way without the prior consent in writing of the Local Planning Authority. The trees shall be protected during demolition and construction work using the methods described in Appendix 5 of the Assessment. The reason for the condition is:- The existing trees represent an important visual amenity which the Local Planning Authority consider should be substantially maintained.
10.REASON FOR APPROVAL OF THE APPLICATION :- The proposal meets the criteria of Policy BNV16 of the Great Yarmouth Borough-Wide Local Plan.
11.NOTES - Please read the following notes carefully:-
12.This development involves works within the public highway that can only be carried out by Norfolk County Council as Highway Authority unless otherwise agreed in writing. It is an OFFENCE to carry out any works within the Public Highway, which includes a Public Right of Way, without the permission of the Highway Authority. Please note that it is the applicant's responsibility to ensure that, in addition to planning permission, any necessary consents or approvals under the Highways Act 1980 and the New Roads and Street Works Act 1991 are also obtained from the County Council. Advice on this matter can be obtained from the County Council's Highway Development Control Group. Please contact Mr Paul Leared on 01493 846393. If required, street furniture will need to be repositioned at the applicant's expense.