| No. | Condition Text |
|---|
| 1. | The development must be begun not later than three years beginning with the date of this permission.
The reason for the condition is :-
The time limit condition is imposed in order to comply with the requirements of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. |
| 2. | The development hereby permitted shall be carried out in accordance with the application form, plan, and drawings and other documents and details submitted or provided by the applicant as amended by email and drawings (ref: C4515-SF03 Rev A and C4515-P02 Rev C) submitted on 17 December 2009.
The reason for the condition is :-
For the avoidance of doubt and to ensure the satisfactory appearance of the development within the Conservation Area. |
| 3. | No part of the proposed structure shall overhang or encroach upon the highway boundary and no door or window shall open outwards over the public highway.
The reason for the condition is :-
To ensure the safety of all pedestrians using the public footway. |
| 4. | Prior to the first use of the development hereby permitted the proposed apron area between the front boundary of the premises and the public highway shall be reinstated flush with the finished level of the public footway, fully eliminating all trips and hazards to pedestrian safety. All amterails proposed shall be surfaced in accordance with details as submitted to and agreed in writing with the local planning authority and shall be maintained thereafter.
The reason for the condition is :-
To ensure the safe and free passage of pedestrians on the public footway. |
| 5. | The underside of Row 102 will require one-hour fire resistance to be supplied and fitted. All details, including materials and fitting methods, shall be submitted to and approved in writing by the local planning authority.
The reason for the condition is :-
To ensure the satisfactory appearance of the fireproofing within the Conservation Area and to maintain the integrity of the protected rows. |
| 6. | REASON FOR APPROVAL OF THE APPLICATION :-
The proposal meets the provisions of the Great Yarmouth Borough Wide Local Plan and, in particlular, policies SHP15 and BNV18. |